Quotation Are Invited For Design, Fabrication, Supply And Erection Of Working Platform For Lsf @ Kro

Tender Detail

108170098
2332600261
Self-Funded
Quotation Are Invited For Design, Fabrication, Supply And Erection Of Working Platform For Lsf @ Kro
NCB
Asia
Arab World1,Gulf Cooperation Council, GCC,Middle East,Middle East and North Africa, MENA
03-02-2026

Work Detail

Quotation are invited for Design, Fabrication, Supply and Erection of Working Platform for LSF @ KRO. DESIGN, ENGINEERING, SUPPLY, FABRICATION, SURFACE PROTECTION,TRANSPORTATION, ERECTION, TESTING, AND COMMISSIONING OF A WORKING HEIGH TPLATFORM FOR MANUAL RECHARGING OF LSF, COMPLETE IN ALL RESPECTS,SUITABLE FOR COASTAL / MARINE ENVIRONMENT.2. LSF & PLATFORM ARRANGE MENT·#TOTAL 10 (TEN) LSF UNITS ARRANGED IN 02 (TWO) ROWS, EACH ROWCONSISTING OF 05 (FIVE) LSFS.·#THE PLATFORM SHALL BE ARRANGED TO P ROVIDE SAFE AND UNOBSTRUCTEDACCESS TO BOTH ROWS FOR MANUAL RECHARGING OPERATIONS.·#FINAL PLATFORM CONFIGURATION SHALL BE FINALIZED D URING DETAILEDENGINEERING AND APPROVED BY THE CLIENT.3. DESIGN CRITERIA·#THE PLATFORM SHALL BE DESIGNED, FABRICATED, AND ERECTED IN ACCORDANCEWITH APPLICABLE INTERNATIONAL STANDARDS AND BEST ENGINEERING PRACTICES.·#ALL DESIGN CALCULATIONS, LOAD CALCULATIONS, AND STRUCTURAL ANALYSISSHALL BE CARRIED OUT AS PER INTERNATIONAL STANDARDS AND SUBMITTED TO THECLIENT FOR REVIEW AND APPROVAL PRIOR TO FA BRICATION.·#MINIMUM DESIGN LIVE LOAD: 5.0 KN/M², IN ADDITION TO DEAD LOAD, WINDLOAD, AND OTHER APPLICABLE LOADS.·#DESIGN SHALL ENSUR E ADEQUATE STRENGTH, STABILITY, AND SERVICEABILITYUNDER ALL OPERATING CONDITIONS.THE PLATFORM SHALL BE DESIGNED AND ENGINEERED IN AC CORDANCE WITH THELATEST EDITIONS OF THE FOLLOWING STANDARDS (AS APPLICABLE):·#IS 800 # GENERAL CONSTRUCTION IN STEEL·#IS 875 (PART 1 , 2 & 3) # DEAD, LIVE & WIND LOADS·#IS 2062 # STRUCTURAL STEEL·#IS 3696 / IS 13367 # SAFETY FOR WORKING AT HEIGHT·#OSHA / EN / ISO S TANDARDS FOR INDUSTRIAL ACCESS PLATFORMS·#ISO 12944 # CORROSION PROTECTION OF STEEL STRUCTURES (COASTAL /MARINE # C5)ALL STATUTORY AND LOCAL SAFETY REGULATIONS SHALL BE STRICTLY COMPLIEDWITH.4. STRUCTURAL SYSTEM·#PLATFORM STRUCTURE SHALL BE FABRICATED FROM STRUCTU RAL STEEL SUITABLEFOR MARINE APPLICATIONS.·#CONNECTIONS SHALL BE BOLTED AND/OR WELDED AS PER APPROVED DESIGN.·#ALL STRUCTURAL MATERI ALS SHALL BE HOT DIP GALVANIZED AND FASTENERS TOBE STAINLESS STEEL, SUITABLE FOR COASTAL ENVIRONMENTS.5. FLOORING·#PLATFORM AND STAI RCASE FLOORING SHALL BE GRP GRATING / GRP CHECKERPLATE, ANTI-SLIP, UV RESISTANT, FIRE RETARDANT, AND SUITABLE FORCORROSIVE COASTAL E NVIRONMENTS.6. ACCESS & SAFETY·#STAIRCASES SHALL BE PROVIDED WHEREVER REQUIRED FOR SAFE ACCESS TO THEPLATFORM.·#STAIRCASES SHALL HAV E ANTI-SLIP TREADS AND HANDRAILS ON BOTH SIDES.·#PLATFORMS AND STAIRCASES SHALL BE PROVIDED WITH HANDRAILS, MID-RAILS,AND TOE BOARDS ON ALL OPEN SIDES.7. CORROSION PROTECTION·#ALL STRUCTURAL STEEL SHALL BE HOT DIP GALVANIZED AND FURTHERPROTECTED WITH A MARINE-GRAD E PAINTING SYSTEM SUITABLE FOR COASTALEXPOSURE.·#GRP COMPONENTS SHALL BE CORROSION RESISTANT AND MAINTENANCE FREE.8. FABRICATION, ER ECTION & QUALITY·#FABRICATION SHALL BE CARRIED OUT IN APPROVED WORKSHOPS.·#ERECTION SHALL BE PERFORMED BY QUALIFIED PERSONNEL FOLLOW ING APPROVEDERECTION PROCEDURES AND SAFETY PRACTICES.·#ALL MATERIALS AND WORKMANSHIP SHALL BE SUBJECT TO INSPECTION ANDAPPROVAL.9. W ARRANTY·#THE CONTRACTOR SHALL PROVIDE AN UNCONDITIONAL WARRANTY FORWORKMANSHIP AND MATERIALS FOR A PERIOD OF 02 (TWO) YEARS FROM THE DATEOF COMMISSIONING.10. DOCUMENTATION & HANDOVER·#SUBMISSION OF APPROVED DRAWINGS, DESIGN CALCULATIONS, TESTCERTIFICATES, AND AS-B UILT DRAWINGS SHALL FORM PART OF THE SCOPE.·#FINAL HANDOVER SHALL BE COMPLETED ONLY AFTER CLIENT APPROVAL. Qty: 1 Design, Fabrication, Supply and Erection of working platform for LSF @ KRO Contact: [email protected] STANDARD TERMS & CONDITIONS 1) Prices should be DDP delivery duty paid at DEWA stores. 2) Quotation to be submitted only in local currency U.A.E Dirhams 3) DEWA Standard payment terms is 30 days credit from the date of acceptance of material 4) No DEWA staff or his or her relatives up to third degree should have ownership or partnership in your company, and your participation in DEWA tenders / RFQs should not constitute a Conflict or perceived Conflict of Interest. Supplier Registration: https://srm.dewa.gov.ae/irj/portal/anonymous/regis Tender Link : https://srm.dewa.gov.ae/sap/opu/odata/sap/ZSRM_RFX_REG_BID_SRV/AttachmentSet(2332600261)/$value

Key Value

Tender Value
Refer document

Attachment

FileName File Description
Global Tender Document dbe7c090-1673-4d29-98cd-94a37d46925a.pdf
Attachments
Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2026 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail