1. The Subject Of The Order Is The Construction Of A Network Of Bicycle Paths In The Tuchola District In Order To Channelize Tourist Traffic - Stage Ii. The Scope Of The Investment Includes The Reconstruction Of District Road 1009C On The Raciąż - Tuchola Section, Consisting In The Construction Of A Bicycle Path On The Section From Km 1+446 To Km 3+327 (Local Kilometer Of The Bicycle Path). The Length Of The Section Covered By The Investment Is 1,881 Km. 2. The Order Concerns The Project Entitled Construction Of A Network Of Bicycle Paths In The Tuchola District In Order To Channelize Tourist Traffic - Stage Ii Co-Financed By The European Regional Development Fund Under Priority 3. European Funds For Sustainable Urban Transport Measure 3.3 Development And Improvement Of Urban And Suburban Mobility Oppt Specific Objective 2 (Viii) Supporting Sustainable Multimedia Urban Mobility As An Element Of The Transformation Towards A Zero-Emission Economy Of The European Funds For Kujawy And Lithuania Program Pomerania 2021-2027.3. The Scope Of Works Includes In Particular (The Road And Electrical Sectors Are To Be Performed Within The Scope Of This Order): 1) Clearing Of Greenery, 2) Execution Of Earthworks, 3) Protection Of Power Cables, 4) Construction Of Substructure, 5) Construction Of Asphalt Concrete Path Surface, 6) Construction Of Exits, 7) Road Safety Elements, 4. A Detailed Description Of The Subject Of The Order Is Included In The Design Documentation Approved By The Decision To Authorize The Implementation Of A Road Investment Constituting Annex No. 8 To The Swz, The Bill Of Quantities Constituting Annex No. 10 To The Swz, As Well As In The Technical Specifications For The Execution And Acceptance Of Construction Works, Constituting Annex No. 9 To The Swz.5. The Contractor, Without Additional Remuneration, Undertakes To: 1) Perform All Preparatory Works, Including Cleaning Works, Organization And Maintenance Of The Construction Site, Provide An Energy Connection For The Construction Site And Bear The Costs Of Their Consumption, 2) Mark And Secure The Construction Site, 3) Bear All Costs Of Research, Expert Opinions And Opinions Necessary To Assess The Quality Of The Works And Proper Execution Of The Subject Of The Order, 4) Bear The Costs Of Exporting Excess Soil And Old Materials, Rubble, Etc. To The Place Designated By The Ordering Party (Ul. Przemysłowa 6, Tuchola), 5) Incurring Costs Related To The Acceptance Of Completed Works, 6) Preparing A Traffic Management Project For The Duration Of The Works Before Entering The Construction Site, 7) In The Event Of Damage To Equipment Or Parts Thereof (Including Water And Sewage Networks, Electricity, Electrical Engineering, Drainage Devices And Municipal Roads) During The Implementation Of The Subject Of The Order - Repairing Them And Restoring Them To Their Original Condition, 8) Covering The Costs Of Possible Compensation For Entering The Construction Site Land And Destruction Of Crops,9) Coverin
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.