Lot 1 - Disinsection, (Integrated Control Of Pests, Cockroaches, Ants, Moths, Flies, Spiders), Considering The Total Footage Of The Built Area Being Considered For Measuring The Internal And External Area As A Single Measurement. (With Monitoring), Lot 1 - Rat Control, Rodenticide Application With Block Presentation. Each Application Corresponds To 1 Point (Mousetrap) With 2 Rodenticide Bait, Lot 1 - Termite Control, Application Of Termiteicide, Lot 2 - Removal, Capture And Removal Of Hives And Swarms Of Bees, Wasps And Wasps. Management Respecting Environmental Standards, Lot 3 - Correct Eviction Management Of Birds, Pigeons And Bats Respecting Environmental Standards; Vacuuming Feces And Eliminating Bacteria, Sanitizing The Site; Sealing All Possible Entrances With Screens To Prevent The Return Of Birds/Animals, 01/28/2026 - 15:22:04, Lot 4 - Sanitization, Disinfection And Debacterization Of Water Tanks Made Of Polyethylene, Stainless Steel, Fiberglass, Fiber-Cement Reinforced Polyester/Capacity From 0 To 500 Liters, Fiber-Cement Reinforced Polyester/Capacity From 501 To 1,000 Liters, Reinforced Polyester Fiber Cement/Capacity 1,001 To 2,000 Liters, Fiber Cement Reinforced Polyester/Capacity 2,001 To 5,000 Liters, Fiber Cement Reinforced Polyester/Capacity 5,001 To 10,000 Liters, Fiber Cement Reinforced Polyester/Capacity 10,001 Liters 20,000 Liters, Fiber-Cement Reinforced Polyester/Capacity 20,001 To 30,000 Liters, Fiber-Cement Reinforced Polyester/Capacity 30,001 To 40,000 Liters