Architectural, Construction, Engineering And Inspection Services – Design Team Zielhorsterweg Fire Station In Amersfoort. The Assignment Consists Of The Integral Design Assignment For The Fire Station On The Zielhorsterweg. This Concerns: - Building Of Approximately 1,700 M2 Gross Floor Area. - The Integral Design In The Phases Of Sketch Design, Preliminary Design, Final Design. The Do Forms The Basis For The Engineering & Build Agreement With A Construction Consortium. - Integral Design Gift Concerns The Expertise Of Architect, Interior Architect, Constructor, E+W+T Installations, Sustainability/Safety/Building Physics/Acoustics And Fire Safety Advisor. - Testing In The Engineering Phase (Technical Design, Implementation Design), Construction Preparation And Implementation Phase. Building Of Approximately 1,700M2 Gross Floor Area.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.