Engineering Design Services - No. 74 Preparation Of Main Road Quadruple. The Designer Is Responsible For The Study Plan, Track Version 1/A. Preparation Of Plans Corresponding To The Insert Version. Due To The Physical Design Of 2X2 Lanes, The Planning Of The Bypass Sections Affecting The Settlements Of Hahó, Zalaszentbalázs And Bocska, While On The Outlying Sections, If Possible, The 74 No. The Existing Route Of The Main Road Needs To Be Developed. The Number Of Nodes Is 15, Of Which 7 Are Separate Levels, And The Number Of Bridge Structures Is 46. The Beginning Of The Section Is The M7 Motorway No. 74. The Northern Subnode Of A Main Road Junction. Using A New Track, The Route Avoids The Affected Settlements (Hahót Settlement From The East Side, Touches The Less Valuable Natura 2000 Areas, But At The Same Time Significantly Reduces The Impact On The Facilities On The East Side Of The Settlement (Peat Mine, Drinking Water Wells, Major, Etc.), Then Follows The Existing Route From Highway Junction No. 75, According To The Study Plan, Connecting At Km No. 46+820 74-76-762 Traffic Junction (Which Junction Is Not Part Of The Technical Content) After That, The Further Planning Of The Highway No. 47+000 Connecting Átkötő Utca, Outer Lidl Junction According To Km 49+000 50+520 Km To The Junction Of The Main Road No. 74. The Continuous Length Of The Main Road Is About 51 Km For Amending And Obtaining Decisions (Investigation Of The Development Potential Of 2 Existing Engineering Plants (Nagykanizsa And Zalaegerszeg)) Preparation And Submission Of Modified Erd, N2000 Impact Assessment And Eia To The Environmental Protection Authority For Environmental Protection Permit Modification, If Necessary For Obtaining New Evd Decisions, Preparation Of Modified And Supplemented Route Designation Documentation, Preparation Of Authorization And Construction Plan For The Entire Section And Its Related Facilities - By Applying The Bim Model - In Relation To Road Construction, High-Rise Construction, And Other Related Branches, The Designer Is Obliged To Act In Accordance With The Applicable Regulations Of Act Lxix Of 2023, In Particular Decree 23/2025.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.