Tenders Are Invited For Establishment Of A Summer Swimming Pool In Zielona

Tender Detail

107934775
ZBM.271.2.2026
Self-Funded
Tenders Are Invited For Establishment Of A Summer Swimming Pool In Zielona
NCB
central europe
European Union
05-02-2026

Work Detail

The Subject Of The Order Is The Task Entitled: Creation Of A Summer Swimming Pool In Zielona, Regarding The Construction Of A Floating Pier On The Zielona Pond In The Town Of Zielona (Kalety) On Plot 131/36 And The Separation Of A Place Occasionally Used For Bathing. The Project Is Implemented Under The Rural Program For 2023 - 2027 As Part Of The Intervention I.13.1 Leader/Development Local Community Driven (Clld) - Lsr Implementation Component. A Floating Pier Is Planned To Be Installed In The Zielona Reservoir Area. The Bridge Is Planned To Be Constructed Using Floating Bridge Technology, With Polyethylene Cube Floats And Additional Equipment. The Facility Will Be Accessible From The Existing Beach. There Will Be A Designated Area Near The Pier That Will Be Occasionally Used For Bathing. Two Zones Are Planned. A Shallower One For Children And A Deeper One For Those Who Can Swim, Covering A Part Of The Waters Located Further From The Shore. The Places Will Be Separated By Buoys And A Pier In Accordance With The Drawing. There Are Ladders On The Platform Enabling Descent To The Reservoir. The Sites Are Also Accessible From The Beach. Lifeguard Stations Will Also Be Located On The Pier. The Facility Will Be Used For Recreational And Occasional Bathing Purposes. For Most Of The Year, The Pier Will Be A Scenic And Scenic Feature, And In The Summer, When A Swimming Area Is Separated, It Will Be Used To Service It. Boats Will Be Able To Moor To The Pier All Year Round. General Data: • Area 507 M2 • Length 80 M • Width 27 M • Height: 25 Cm The Designed Cube Pier Will Be Made Of Polyethylene Using The Rotational Molding Method. Polyethylene Is A Material Completely Resistant To Weather Conditions. It Does Not Absorb Water And Is Very Durable, Even At Low Temperatures. The Basic Element Of The Pier Is A Rectangular Float, Which Is Also A Buoyancy Element, A Supporting Structure Of The Deck And A Walkway Of The Pier. The Platform Is Made Using Floating Technology, Without Permanent Connection To The Ground. The Pier Will Be Used Exclusively For General Use Of Waters And Will Fulfill A Recreational Function. A Detailed Description Of The Subject Of The Order Includes: Land Development Design, Architectural And Construction Design, Technical Design, Bill Of Quantities And Technical Specification For The Execution And Acceptance Of Construction Works, As Well As The Decision On The Water Permit And The Decision On The Construction Permit Constituting Annex No. 9 To The Swz - Technical Documentation To This Swz.

Key Value

Tender Value
Refer document

Attachment

FileName File Description
Global Tender Document 48a0a223-f049-4702-9409-74a521784836.html
Attachments
Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2026 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail