Phase I - Reform And Adaptation Installation Of Air Conditioning And Ventilation Masia Can Roviralta- Alberg.Alberg Building Actions - Phase I.- Removal Of The Two Diesel Boilers And The Replacement Of Them With Two Aerothermal Heat Pumps For The Production Of Hot Water (Sanitary Hot Water) And Heating. Replacement Of Radiators. Reform Of The Thermal Production System And Distribution Pipes Inside The Room. Updating Air Conditioner Components For Primary Air Renewal.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.