Tenders Are Invited For Rehabilitation Of The East Quay In Lom Port Terminal Under The Project Flood Prevention In Lom - Reconstruction Of The East Quay

ICB — International Competitive Bid Closed Eastern Europe
Tender Information
GTR Reference
107871240
Tendering Authority
Subscribe to view
Tender No
01158-2026-0008
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Rehabilitation Of The East Quay In Lom Port Terminal Under The Project Flood Prevention In Lom - Reconstruction Of The East Quay
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Eastern Europe
Political Region
Balkans,European Union,G20
Last Date of Bid Submission
27-02-2026 Closed
Work Detail
Carrying Out The Cmr Of The Site: Rehabilitation Of The Eastern Quay In Lom Port Terminal Under The Project Prevention Of Floods In Lom - Reconstruction Of The Eastern Quay, Will Be Carried Out According To The Project, The Technical Specification, The Requirements And Instructions Of The Contracting Authority And In Compliance With The Legislation In The Republic Of Bulgaria. According To The Approved Project, For The Eastern Quay In Lom Port Terminal, The Following Are Set: Construction Of A New Supporting Vertical Wall In Front Of The Existing One; Raising The Elevation Of The Territory And The Edge Of The Quay; Construction Of New Under-Crane Roads And Track Developments; Construction Of A New External Electric Power Supply For The Crane Mechanism With The Installation Of New Pole Boxes And Electric Cable Routes From The Existing New Substation. Drainage With Drainage Ditches And Collectors To A Separator Is Planned, Through Which The Surface Flows Are Mechanically Treated And Discharged Into The River - Category Ii Water Intake. The New Retaining Wall Will Be Built Perpendicular To The South Quay, With A New Quay Edge Envisaged At A Distance Of 202Cm From The Currently Most Prominent Edge. The Gap Between The New Wall And The Existing Deformed Wall Will Be Filled With Underwater Concrete Grade C 12/15. On The New Quay Wall, Two Track Groups Of Two Tracks Each, Drawn Into The Under-Crane Spaces, Are Planned, With The Front Under-Crane String Located 3.50 M From The Edge Of The New Quay. Essentially, The Rehabilitation Of The Eastern Quay Provides For The Straightening Of The Cordon Of The Quay, Deformed Towards The Water Area During The Accident With A Maximum Arrow Of 165 Cm, Raising The Setting To Equal The Elevation Of The Southern Quay And Raising The Abutment Along Its Entire Width By Nearly 2.50 M Together With The Track Groups, Under-Crane Roads, Pavements, Etc. The Structural Solution In The Project Envisages The Construction Of A Combined Anchored Steel Structure Of Main Tubular Bearing Elements With A Paired Tkl 603D (Double Pile) Tongue, Which Will Be Used To Straighten The Line Of The Existing Pier And Raise It To The Elevation Of 34.25, Which Is The Elevation Of The South Pier, As Well As Raise The Vertical Layout Of The Entire Stern.
Key Value
Tender Value
13,757,868 - BGN
Tender Documents
Global Tender Document
3b666fef-eb88-474b-a336-baad4ebc4572.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders