GTR 107800322
Tenders Are Invited For Of The Contract Consists In Rehabilitating The Two Buildings Of The Emili Carles-Tolrà School, Solving The Pathologies Identified And At The Same Time, Improving The Energy Efficiency Of The Whole. Action Will Be Taken In Three Areas: - Facades And Fences: Re-Plastered, Sanitized And Painted. Area Of Operation Building 1 = 1060M2 Area Of Operation Building 2 = 1118M2 Total Area Of Operation = 2178M2 - Roofs: The Entire Roof Will Be Insulated, Waterproofed Again And The Tiles Will Be Replaced. False Ceilings Will Be Replaced And Gutters Will Be Installed To Collect Rainwater. Area Of Action Building 1 = 943M2 Area Of Action Building 2 = 898.98M2 Total Area Of Action = 1841.98M2 - Carpentry: All Carpentry Will Be Replaced By Equivalents With Better Thermal Performance. It Will Be Carried Out In Two Phases: - Phase 1: Roofing, Insulation And False Ceilings Will Be Carried Out. - Phase 2: Facades And Carpentry Work Will Be Carried Out
ICB — International Competitive Bid
Closed
Southern Europe
Tender Information
GTR Reference
107800322
Tendering Authority
Subscribe to view
Tender No
CONT2500145
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Of The Contract Consists In Rehabilitating The Two Buildings Of The Emili Carles-Tolrà School, Solving The Pathologies Identified And At The Same Time, Improving The Energy Efficiency Of The Whole. Action Will Be Taken In Three Areas: - Facades And Fences: Re-Plastered, Sanitized And Painted. Area Of Operation Building 1 = 1060M2 Area Of Operation Building 2 = 1118M2 Total Area Of Operation = 2178M2 - Roofs: The Entire Roof Will Be Insulated, Waterproofed Again And The Tiles Will Be Replaced. False Ceilings Will Be Replaced And Gutters Will Be Installed To Collect Rainwater. Area Of Action Building 1 = 943M2 Area Of Action Building 2 = 898.98M2 Total Area Of Action = 1841.98M2 - Carpentry: All Carpentry Will Be Replaced By Equivalents With Better Thermal Performance. It Will Be Carried Out In Two Phases: - Phase 1: Roofing, Insulation And False Ceilings Will Be Carried Out. - Phase 2: Facades And Carpentry Work Will Be Carried Out
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Southern Europe
Political Region
European Union
Last Date of Bid Submission
17-02-2026
Closed
Work Detail
Of The Contract Consists In Rehabilitating The Two Buildings Of The Emili Carles-Tolrà School, Solving The Pathologies Identified And At The Same Time, Improving The Energy Efficiency Of The Whole. Action Will Be Taken In Three Areas: - Facades And Fences: Re-Plastered, Sanitized And Painted. Area Of Operation Building 1 = 1060M2 Area Of Operation Building 2 = 1118M2 Total Area Of Operation = 2178M2 - Roofs: The Entire Roof Will Be Insulated, Waterproofed Again And The Tiles Will Be Replaced. False Ceilings Will Be Replaced And Gutters Will Be Installed To Collect Rainwater. Area Of Action Building 1 = 943M2 Area Of Action Building 2 = 898.98M2 Total Area Of Action = 1841.98M2 - Carpentry: All Carpentry Will Be Replaced By Equivalents With Better Thermal Performance. It Will Be Carried Out In Two Phases: - Phase 1: Roofing, Insulation And False Ceilings Will Be Carried Out. - Phase 2: Facades And Carpentry Work Will Be Carried Out
Key Value
Tender Value
1,494,815 - EUR
Tender Documents
Global Tender Document
d9495436-82ca-4f3d-8ef1-e76b7929a280.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.