Test Boring Work – Basic Repair Of The Kachlet Weir: Exploratory Drilling Of The Upper Water Separating Mole. Exploratory Drilling Is To Be Carried Out At The Separating Pier Between The Weir System And The Kachlet Power Plant. The Measure Includes The Assessment Of The Structural Condition Of The Separation Pier In Accordance With The Data Sheet Dwa-M 506. The Service To Be Awarded Essentially Includes: - 13 Vertical Core Removals With Borehole Scans And Wd Tests - Laboratory Tests On The Backfill Gravel - Measurement Of The Drilling Starting Points - Sigeko (Safety And Health Protection Coordination)
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.