GTR 107739172
Tenders Are Invited For Construction Work For Pipelines, Communication And Power Lines - Engineering - Design And Construction For Completion Of Plumbing Infrastructure In The Town Of Novi Iskar, Novi Iskar District, Metropolitan Municipality
ICB — International Competitive Bid
Closed
Eastern Europe
Tender Information
GTR Reference
107739172
Tendering Authority
Subscribe to view
Tender No
45533-2026
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Construction Work For Pipelines, Communication And Power Lines - Engineering - Design And Construction For Completion Of Plumbing Infrastructure In The Town Of Novi Iskar, Novi Iskar District, Metropolitan Municipality
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Eastern Europe
Political Region
Balkans,European Union,G20
Last Date of Bid Submission
23-02-2026
Closed
Work Detail
Construction Work For Pipelines, Communication And Power Lines - Engineering - Design And Construction For Completion Of Plumbing Infrastructure In The Town Of Novi Iskar, Novi Iskar District, Metropolitan Municipality. Engineering - Design And Construction For The Completion Of The Water Supply Infrastructure Of The Town Of Novi Iskar, Novi Iskar District, Sofia Municipality, Included In The Investment Intention Of The So For Financing From The 2021-2027 Pos. For The Site, A Conceptual Project Has Been Prepared And Updated. With The Implementation Of The Project, Compliance With European And National Legislation In The Field Of Waste Water Disposal And Treatment Will Be Achieved (Directive 91/271/Eec On The Treatment Of Urban Waste Water). The Construction Of The Sewage Network Is The Effective Measure For The Improvement And Development Of The Infrastructure For Wastewater From The Territory. In Accordance With The Updated Concept Project, The Investment Intention Has Been Prepared, Which Includes: The Completion Of The Sewerage Network To Cover A Larger Percentage Of Users; Removal Of Wastewater From The Territory For Treatment; Elimination Of Direct Discharges Into Water Intakes Passing Through The Considered Territory; Improvement Of The Citys Water Supply, Through The Completion And Reconstruction Of The Water Supply Network. With The Implementation Of The Above Measures, It Will Contribute To: Achieving Compliance With Directive 91/271/Eec For Urban Waste Water Treatment; Environmental Protection; Reduction Of Water Losses; Regulation Of Water Quantities; Increasing The Efficiency Of The Water Supply Network; Increasing The Quality Of Water Supply Services; Minimization Of The Need For Frequent Repairs And Interruptions Of Water Supply And Improvement Of The Sanitary, Hygienic And Ecological Conditions Of The Residents Of The Town Of Novi Iskar. The Subject Of This Order Includes: 1. Preparation Of An Investment Project In The Technical Design (Tp) Phase In Accordance With Ordinance No. 4 Of 21.05.2001 On The Scope And Content Of Investment Projects, Zut And The By-Laws On Its Implementation; 2. Coordination Of The Project With All Control Bodies, Operating Companies And Institutions According To The Requirements Of The Normative Base; 3. Carrying Out Authors Supervision On The Ppe, Technical Solutions, Refinements And Changes To The Project, Technological Control And Assistance In Putting The Site Into Operation. 4. Construction Of: • Storm Sewer, Incl. Inspection Shafts And Resurfacing; • Domestic Sewerage, Incl. Inspection Shafts And Resurfacing; • Mixed Sewerage, Incl. Inspection Shafts And Resurfacing; • Reconstruction And Completion Of Water Pipes; • Road Works - Road - Restoration Of Road Surface Outside Trench Excavation For Sewage Networks And Facilities (Asphalt Concrete Surface). Demolition And Restoration Of Curbs And Pavement Tiles. Construction Of New Curbs And Sidewalks. - Displacement Of Electricity And Telephone Networks, Etc. Activity 1. Preparation Of An Investment Project The Investment Project In The Technical Project Phase Is Prepared In Accordance With The Conceptual Project And The Scope Of The Investment Intention. The Investment Project In The Technical Design Phase Should
Key Value
Tender Value
18,665,039 - BGN
Tender Documents
Global Tender Document
40d1b29f-d36c-4c77-83ec-4bd9953daa42.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.