GTR 107671189
Tenders Are Invited For Construction Work – Master Builder Work
ICB — International Competitive Bid
Closed
Western Europe
Tender Information
GTR Reference
107671189
Tendering Authority
Subscribe to view
Tender No
37948-2026
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Construction Work – Master Builder Work
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Western Europe
Political Region
European Union,G20
Last Date of Bid Submission
25-02-2026
Closed
Work Detail
Construction Work – Master Builder Work. Master Builders Work, Description Of The Work/Main Masses: Construction Site Setup, Setting Up, Provision, Dismantling: - Construction Management Container - Tree Protection Fence, 300 M - Construction Fence, 350 M - Construction Water Connections, 10 Pcs. - Washroom Container, 1 Piece. Demolition, Preparatory Measures: - Dismantling Of Fire Doors, 32 Pieces, - Dismantling Balcony Railings, 30 M - Dismantling Wooden Windows In The Warehouse, 134 Pieces. Basement Measures: - Aid For Complete Cellar Clearance (118 Cellar Compartments) - Closing Cellar Windows, 141 Pcs. - Plaster Demolition Of Basement Walls: 4,000 Cm - Ceiling Insulation, Resol Hard Foam, Wlg 022, D=85 Mm, 1,900 Sqm - Side Insulation, Resolharat Foam, Wlg 022, D=85 Mm, 800 Sqm - Side Insulation, Resolharat Foam, Wlg 022, D=55 Mm, 800 - Cellar Partition System, Steel-Wood, 310 M - Aid For Re-Occupancy Of Cellar Compartments (118 Cellar Compartments) Measures Window Replacement/Natural Stone Work: - Dismantling Existing Windows (558 Pcs.), - Plastering The New Windows Installed On Site (558 Pcs.) - New Window Sills In Natural Stone In The Stairwell Concrete Renovation: - Concrete Renovation On Existing Balconies, 3 Pcs. - Composite Screed And Coating Of The Balconies, 8 Sqm Each, 3 Pieces. - Concrete Renovation Entrance Platforms, 29 Pieces. Fire Protection Measures, Stairwell Measures: - Close Mailbox Niches, 14 Pcs. - Renewal Of Fire Doors, 31 Pieces. - Plaster Repairs, Soffits, Attic Measures: - Thermal Insulation Layer, Miwo 035 20 Cm + Dry Screed >19 Mm, 2,100 Sqm - Knee Floor Insulation With 2-Layer Wood Wool Board, 22.5 Cm, Wlg 035, 150 Sqm - Ceiling Insulation, Staircase, Miwo, 035, 26 Cm, 250 Sqm - Uninsulated Window Elements, W/H Approx. 31/39 Cm, Or 96/30 Cm, 134 Pieces. Facade After Scaffolding Dismantling: - Pick Up The Paving And Store It To The Side, 650 Sqm - Excavation Of The Base Zone And Disposal Of The Material, Approx. 150 M² - Sealing Of The Former Window Area, Approx. 100 M² - Refilling Of The Base Zone, Approx. 150 M²
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
d107f3de-3b03-4bf0-b24b-9390ccd1faa7.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.