Work 1- Supply And Installation Of Workplate With Galvanized Sheet And Wooden Structure. Af_03/2022_Ps - (Sinapi - 09/2025 - 103689), Work 1- Execution Of Pavement With Application Of Asphalt Concrete, Bearing Layer - Exclusive Cargo And Transport. Af_11/2019 (Sinapi-09/2025 - 95995), Work 1- Loading Asphalt Mixture In Dump Truck 10 M³ (Unit: M3). Af_07/2020 (Sinapi 09/2025 - 100986), Work 1- Transport With 10 M³ Dump Truck, On Paved Urban Road, Dmt Up To 30 Km (Unit: M3xkm). Af_07/2020 (Sinapi 09/2025 - 95875), Work 1- Asphalt Pavement Milling (Depth Up To 5.0 Cm) - Exclusive Transport. Af_11/2019 (Sinapi 09/2025 - 96001), 01/15/2026 - 16:16:06, Work 1- Laying Of Guide (Curb) In Straight Section, Made Of Prefabricated Concrete, Dimensions 100X15x13x30 Cm (Length Top X Height). Af_01/2024 (Sinapi 09/2025 - 94273), Work 1- Execution Of Machined Concrete Gutter, Molded In Situ In A Straight Section, 45 Cm Base X 15 Cm Height. Af_01/2024 - (Sinapi 09/2025 - 94283), Project 1- Painting Of Road Axis On Asphalt With Retroreflective Paint Based On Acrylic Resin With Glass Microspheres, Mechanical Application With Self-Propelled Marker. Af_05/2021 (Sinapi 09/2025 - 102512), Work 1- Painting A Pedestrian Crossing Or Zebrada With Acrylic Paint, E = 30 Cm, Manual Application. Af_05/2021 - (Sinapi 09/2025 - 102501), Binder Layer - Exclusive Cargo And Transport. Af_11/2019 (Sinapi 09/2025 - 95996), Work 1- Demolition Of Asphalt Pavement, Including Cover, Includes Load On Truck - (Siurb Infra-07/2025 - 05-004-000)., Work 1- Box Opening Up To 40Cm, Includes Excavation, Compaction, Transport And Preparation Of Sub-Lead - (Siurb Infra-07/2025 - 05-010-000)., Work 1- Fundação De Rachão - (Siurb Infra-07/2025 - 05-020-000)., Work 1- Binder Bituminous Priming - (Siurb Infra-07/2025 - 05-026-000)., Work 1- Bituminous Waterproofing Priming - (Siurb Infra-07/2025 - 05-027-000)., Work 1- Concrete Walkway Fck=15.0Mpa, Including Box Preparation And Crushed Ballast - (Siurb Infra-07/2025 - 05-042-000)., Work 1- Bica Corrida Base - (Siurb Infra-07/2025 - 05-047-000)., Work 1- Graded Crushed Base - (Siurb Infra-07/2025 - 05-048-000)., Work 1- Transport Of Asphalt Pavement - (Siurb Infra-07/2025 - 05-067-000) Work 1- Removal Of Debris Beyond The First Km - (Siurb Infra-07/2025 - 08-086-000), Work 1- Removal Of Guides, Includes Loading On Truck - (Siurb Infra-07/2025 - 05-001-000)., Work 1- Demolition Of Concrete Pavement, Gutter Or Gutter, Includes Load On Truck - (Siurb Infra-07/2025 - 05-003-000)., Work 1- Transport Of Concrete Pavement, Gutter And Gutter - (Siurb Infra-07/2025 - 05-081-000)., Work 1- Transport Of Guides - (Siurb Infra-07/2025 - 05-082-000).