1. The Subject Of The Order Is Construction Of A Kindergarten With Significantly Improved Energy Performance Parameters In Witoszów Dolny - A Demonstration Facility. The Subject Of The Order Includes The Construction Of A Kindergarten Along With Land Development, Subject To Point 5.2. The Subject Of The Order Includes In Particular The Following: 1) Emptying And Demolition Of Existing Buildings, 2) Earthworks, 3) Foundation Works, 4) Insulation, 5) Reinforced Concrete Structures, 6) Floors And Ceilings, 7) Roof With Gutters, 8) Masonry Works, Walls And Plasterboard Cladding, 9) Interior Finishing, 10) Window And Door Joinery, 11) Facades, 12) Delivery Equipment,13) Switchboards With Receiving Electrical Installation And Lighting,14) Lightning Protection And Earthing Installation,15) Photovoltaic Installation,16) Bms System,17) Structural Network,18) Cctv, Video Intercom, Access, Sswin, Call And Sound Systems,19) Central Heating Installation,20) Water And Sewage Installation,21) Sanitary And Technological Sewage Installation,22) Heating Installation And Cold Water,23) Hydrant Installation,24) Ventilation Installation,25) Land Development Including, Among Others, Surfaces With Substructure, Marking, Greenery, Delivery And Assembly Of Small Architecture Objects, Fencing, Area Lighting,26) Playground,27) Modular Container Building,28) Water Supply Connection And Sanitary Sewage System,29) External Water Supply System And Sanitary Sewage System,30) Rainwater Sewage System With Water Drainage In Accordance With The Conditions Issued By The State Water Management Board Of Polish Waters, Regional Management Board Wodna In Wrocław,31) Research, Tests, Checks, 32) Tidying Up The Area And Waste Disposal.3. The Ordering Party Requires The Contractor To Carry Out The Works In A Multi-Shift System And On Weekends, I.E. In A Way That Guarantees The Completion Of The Subject Of The Order By September 15, 2026. The Above Must Be Carried Out In A Manner That Does Not Violate The Provisions Of The Act Of June 26, 1974 - Labor Code (Journal Of Laws Of 2025, Item 277, As Amended) And Included In The Offered Price. The Contractor Whose Offer Is Selected As The Most Advantageous, 2 Days Before The Agreed Date Of Signing The Contract, Will Submit For The Ordering Partys Approval A Detailed Material And Financial Schedule For The Implementation Of The Order, Developed On The Basis Of The Elements Of The Works Specified In The Material And Financial Statement Constituting Annex No. 12 To The Swz And Taking Into Account The Deadlines For The Stages Of Works Specified In Chapter Viii Of The Swz.4. A Detailed Description Of The Subject Of The Order Is Specified In The Construction Documentation Constituting Annex No. 8 To The Swz And The Technical Specification For The Execution And Acceptance Of Construction Works Constituting Annex No. 9 To The Swz. The Bill Of Quantities Constituting Annex No. 10 To The Swz Is An Auxiliary Document For The Preparation And Valuation Of The