Tenders Are Invited For Thermal Modernization Of A Multi-Family Residential Building Including The Replacement Of Windows And Doors And The Installation Of A Photovoltaic Installation In The Owned Building Tomaszowski Tbs (...).
Tenders Are Invited For Thermal Modernization Of A Multi-Family Residential Building Including The Replacement Of Windows And Doors And The Installation Of A Photovoltaic Installation In The Owned Building Tomaszowski Tbs (...).
The Subject Of The Order Includes In Particular: 1) Thermal Modernization Of The Building, In Accordance With The Audit And Construction Design Attached To The Swz, Including In Particular: - Thermal Modernization Of The Walls Filling The Residential Building With Styrofoam And Wool Of Thickness. 7 And 14 Cm Depending On The Wall In Accordance With The Audit And Construction Design, - Thermal Modernization Of The Walls Of The Plinth Of A Residential Building With Styrofoam Thickness. 14 Cm, - Carrying Out A Major Renovation Of The Balcony Slabs In Accordance With The Construction Design - Thermal Modernization Of The Jambs With Styrofoam - Performing The Necessary Sheet Metal Work Resulting From The Thickening Of The Walls, - Dismantling The Canopies Over The Balconies Of The Top Floor, - Installing The Canopies After The Thermal Modernization Of The Walls, - Works Related To Moving The Intercom Cassettes To The Finished Façade Of The Vestibule, - Facade Cladding With Tiles On The Plinth And The Front Wall Of The Vestibule, - Making The Necessary Roofs Made Of Coated Sheet Metal On All Elements Located Directly Next To The Walls Of The Vestibules, - Making A Band Of Paving Stones On A Sand And Cement Ballast Around The Building With A 2% Slope From The Building, 50 Cm Wide + Edging, - Elevating The Gutters And Downpipes On The Vestibules Forward, Including Their Replacement, With Prior Preparation Of The Substructure Before The Works Thermal Modernization Of Vestibules, - Painting All Steel Elements On The Facade And Balconies With Chlorinated Rubber Paints, 2) Thermal Modernization Of The Ceiling Above The Top Floor And On The Roof; 3) Installation Of A Photovoltaic Installation, Including In Particular: - Construction Of A 6.5 Kwp Photovoltaic Installation, Along With A 10 Kwp Energy Storage Facility In Accordance With The Audit And Construction Design, 4) Replacement Of Lighting Fixtures On Energy-Saving In Common Areas;5) Replacement Of Pvc Windows And Aluminum Entrance Doors To The Building, Including: - Heat Transfer Coefficient For Doors U(Max) ≤ 1.1 W/M2k Due To The Fact That The Tender Procedure In Question Is Planned As A Green Public Procurement - Doors Must Have A Transmittance Parameter U ≤ 1.1 W/M2k Even Though The Energy Audit Parameter Thermal Transmittance For External Doors Is Determined At U ≤ 1.3 W/M2k;6) Thermal Modernization Works In The Basement Of The Building;7) Thermal Modernization Works In The Vestibule;8) In Addition, The Scope Of Work Includes: - Disposal Of Waste Generated After The Works, - All Fees And Arrangements Resulting From The Work (Including Fees For Used Utilities, Fees For Waste Disposal, Occupation Of The Road, Etc.) Are The Responsibility Of Contractor - The Contractor Is Obliged To Install An Electrical Switchboard With A Measuring Point And A Water Intake With A Water Intake And Measuring Point In The Place Indicated By The Ordering Party, At His Own Expense, - The Contractor Is Obliged To Sweep And
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.