The Work Consists Of The Construction Of The Outlet Pipe Of The Existing Network In Villers. Following A Subdivision Project In The Meadow Crossed, It Is More Judicious To Place The Pipeline To Be Built At The Edge Of The Plot In Order To Join The Existing Cv Of The Collector. A Storm Overflow Connected To The Stream Upstream Of This Connection Is Also Planned. The New Pipeline Will Be Made Of Concrete Pipes With A Diameter Of 500 Up To The Do, Then 250 In Polypropylene Up To The Collector. In Terms Of Coating, We Recommend A Complete Coating Of The Concrete Pipes With Lean Concrete, Because Work With Heavy Vehicles Will Be Carried Out On The Plot For The Construction Of The Subdivision. It Is Necessary To Ensure The Sustainability Of The Works. The Pp Pipes Will Be Laid And Coated With Sand-Cement As Prescribed By The Supplier. A Lean Concrete Base Is Required. The Trenches Will Be Backfilled With The Excavated Soil. The Roads Are Classified In Network Iii. The Work Described Above Is Not Exhaustive, The Details Of The Work Are Included In The Technical Clauses And The Summary Measurement Annexed To These Special Specifications. As Part Of This Contract, The Contracting Authority Intends To Combat Social Dumping And Social Fraud.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.