Passenger Boarding Bridges For Ships – Quick Escape Hooks For The Regasification Plant In Barcelona. Design, Manufacturing, Testing, Dap Supply, Installation Assistance And Commissioning Of 10 Rapid Escape Triple Hooks (8 Units Of 125 T And 2 Units Of 150 T), Equipped With A Tension Monitoring System And Remote Triggering From The Console In The Dock Control Room. The System Will Allow Data Transmission To The Ship Via Fiber Optics (Ship-Shore Link) And Integration Into The Dcs System.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.