Tenders Are Invited For Renovation Of Vacant Buildings In The Resources Of The Housing Management Plant In Mikołów In 2026

Tender Detail

107461593
ZGL/TP/01/2026
Self-Funded
Tenders Are Invited For Renovation Of Vacant Buildings In The Resources Of The Housing Management Plant In Mikołów In 2026
NCB
central europe
European Union
30-01-2026

Work Detail

1.The Subject Of The Order Is The Performance Of Renovation Works On Vacant Buildings, Including Construction Works, Installation Works And Electrical Works.2. Description Of The Subject Of The Order: 2.1. Carrying Out Renovation Works On Vacant Buildings, Including Construction Works (Including Preparatory And Reconstruction Works, Waste Disposal And Storage, Execution Of Masonry, Plastering And Flooring Works, Replacement Of Floor Coverings, Painting, Replacement Of Windows And Doors), Installation Works Inside The Building (Including Works: Water And Sewage Installations, Installation Of Devices And Utensils, Gas Installations, Installation Of Devices, Central Heating Installations, Installation Of Devices), Electrical Works (Including Installation Cables, Installation Of Accessories, Installation Of Devices, Tests And Measurements). 2.2. Works That Always Occur: Refreshing The Premises, I.E. Painting, Repairing Plaster And Replacing Devices Such As Bathtubs, Washbasins, Stoves, Etc. 2.3. Works That Occur Less Frequently: Repairing Floors, Replacing Doors And Windows, Replacing Internal Sanitary And Electrical Installations. 2.4. The Basic Scope Of Works Is Included In The Bill Of Quantities Constituting Annex 8 To The Swz. 2.5. Vacant Properties Will Be Submitted For Renovation Successively As They Are Acquired, Therefore The Contractor Must Be Prepared To Possibly Carry Out Work In Several Premises In Parallel. 2.6. Due To The Very Large Diversification Of The Scope Of Renovation, The Scope Of Work Will Each Time Be Settled By The Ordering Party On The Basis Of The Quantity Of Works, Unit Prices Resulting From The Offer Cost Estimate And As-Built Cost Estimate For The Scope Of Works Not Covered By The Offer, Prepared On The Basis Of The Typing Report, Quantity Of Works, In Accordance With The Unit Prices Appearing In The Offer Cost Estimate, And According To The Prices And Rates Of Price Drivers Provided By Contractor In The Offer. 2.7. The Purchase Prices Of Other Materials Not Included In The Offer Will Be Calculated In The Amount Of The Average Prices With Purchase Costs Published In Sekocenbud Bulletins From The Quarter In Which The Work Was Performed, And In The Absence Of Such Prices, The Inspector May Request Access To The Purchase Invoices For The Material Or Device. 2.8. Rental Prices For Other Equipment Not Included In The Offer Will Be Calculated At The Average Prices Together With One-Off Costs Published In Sekocenbud Issues From The Quarter In Which The Work Was Performed. 2.9. On The Day Of Receiving Information About The Occurrence Of Work, The Detailed Scope Of Work Should Be Agreed With The Supervisory Inspectors And The Task Should Be Started No Later Than The Third Business Day After Receiving The Order. 2.10. All Materials Used To Perform Works Should Have The Appropriate Certificates, Approvals And Approvals For Use In Construction Required By Applicable Law. The Contractor Will Always Present Documents Confirming The Ab

Key Value

Tender Value
Refer document

Attachment

FileName File Description
Global Tender Document 4a8e6a30-8f47-4bd7-a958-9aeebc90f6f0.html
Attachments
Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2026 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail