4.1. The Subject Of The Order Is The Implementation Of An Investment Task Titled: Construction Of A Sanitary Sewage Network For The Towns Of Popielowska Kolonia And Popielów - Wielopole, In The Design And Build System, Including: 1) Development - Based On The Functional And Utility Program (Ffu) Provided By The Ordering Party - Design And Cost Estimate Documentation Necessary For The Implementation Of The Project, Together With Obtaining The Necessary Administrative Decisions, Opinions And Permits Enabling The Implementation Of Works In Accordance With The Provisions Of The Construction Law, 2) Execution Of Construction Works - Installations Based On The Design And Cost Estimate Documentation Developed For The Project, Completed With The Preparation Of As-Built Documentation And Active Support For The Ordering Party In Order For The Ordering Party To Obtain An Occupancy Permit Or Notify Pinb About The Completion Of The Works. 3) Installation Of Control And Measurement Chambers In The Water Supply Network. 4.2. A Detailed Description Of The Subject Of The Order Is Included In Annex No. 1 To Swz - Pfu Together With Attachments And Other Documentation.4.3. The Scope Of The Contractors Services Includes In Particular: 1) Preparation Of A Construction And Technical Design (Necessary Industries) Along With Obtaining Consents, Arrangements And Permits As Well As A Building Permit Or Notification Of Works That Do Not Require A Building Permit, 2) Development Of Technical Specifications For The Execution And Acceptance Of Construction Works (Hereinafter Referred To As Stwiorb), 3) Preparation Of An Investors Cost Estimate For All Works Necessary To Perform The Works, 4) Surveying Services, 5) Performance Of Construction Works Related To The Construction Of The Designed Networks And Assembly Control And Measurement Chambers In The Water Supply Network,6) Authors Supervision,7) Carrying Out Tests And Examinations Of Pipelines,8) As-Built Inventory,9) Preparing Acceptance Documentation,10) Obtaining An Occupancy Permit Or Effective Notification Of Pinb About The Completion Of Works (Preparation Of A Set Of Required Documents Together With The Application).
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.