Lot 1 - Local Administration, Lot 1 - Supply And Installation Of Workplate With Galvanized Sheet And Wooden Structure. Af_03/2022_Ps, Lot 1 - Container Rental, Lot 1 - Mobilization/Demobilization - Container Freight, Lot 1 - Crane Freight To Remove Wood Scissors, 01/13/2026 - 18:39:03, 01/14/2026 - 14:12:06, Lot 1 - Siding With Wood Plywood. Af_03/2024, Lot 1 - Removal Of Fiber Cement, Metallic And Ceramic Tiles, Mechanized, Using A Crane, Without Reuse. Af_09/2023, Lot 1 - Removal Of Wooden Mesh For Roofing, Manually, Lot 1 - Removal Of Wooden Scissors, With Spans Equal To 28. 3 M, Without Reuse, Lot 1 - Demolition Of Reinforced Concrete Pillars And Beams, Mechanized Using A Hammer, Lot 1 - Demolition Of Slabs, In Reinforced Concrete, Lot 1 - Demolition Of Perforated Block Masonry, Lot 1 - Removal Of Siding/Metallic And Wooden Sheets, Lot 1 - Removal Of Wooden Flooring (Floor And Beam), Lot 1 - Loading, Maneuvering And Unloading Of Rubble In 18 M Dump Truck - Loading With Hydraulic Excavator (Bucket 0.80 M / 111 Hp) And Free Discharge (T Unit). Af_07/2020, Lot 1 - Transport With 18 M Dump Truck, On Paved Urban Road, Dmt Up To 30 Km (Unit M3xkm). Af_07/2020, Lot 1 - Rental Of Lifting Platform For Roof Removal, Removal Of Light Fixtures, Lot 1 - Freight - Self-Propelled Hydraulic Crane, With Telescopic Boom 40 M, Maximum Capacity 60 T, Power 260 Kw, Lot 1 - Pruning At Height Of Tree With Trunk Diameter Greater Than Or Equal To 0.20 M And Less Than 0.40 M. Af_03/2024, Lot 1 - Mechanically Excavated Pile, Without Stabilizing Fluid, 40Cm In Diameter, Concrete Placed By Concrete Mixer Truck (Exclusive Mobilization And Demobilization). Af_01/2020, Lot 1 - Assembly Of Pile Reinforcement, Diameter 10, 0 Mm. Af_09/2021_Ps, Lot 1 - Assembly Of Transverse Reinforcement Of Circular Section Piles, Diameter 5, Lot 1 - Manufacture, Assembly And Disassembly Of Formwork For Crowning Block, In Sawn Wood, E25 Mm, 1 Use. Af_01/2024, Lot 1 - Block Frame Using 5 Mm Ca-60 Steel - Assembly. Af_01/2024, Lot 1 - Block Frame Using 8 Mm Ca-50 Steel - Assembly. Af_01/2024, Lot 1 - Block Frame Using 10 Mm Ca-50 Steel - Assembly. Af_01/2024, Lot 1 - Block Frame, Insulated Footing, Baldrame Beam And Running Footing Using 16 Mm Ca-50 Steel - Assembly. Af_01/2024, Lot 1 - Concreting Of Crowning Block Or Baldrame Beam, Fck 30 Mpa, Using A Pump - Laying, Thinning And Finishing. Af_01/2024, Assembly And Disassembly Of Formwork For Footing, Lot 1 - Insulated Footing Frame, Baldrame Beam And Running Footing Using 5 Mm Ca-60 Steel - Assembly. Af_01/2024, Baldrame Beam And Running Shoe Using 10 Mm Ca-50 Steel - Assembly. Af_01/2024, Baldrame Beam And Running Shoe Using 12.5 Mm Ca-50 Steel - Assembly. Af_01/2024, Insulated Shoe And Running Shoe Using 20 Mm Ca-50 Steel - Assembly. Af_01/2024, Lot 1 - Concreting Of Footing, Assembly And Dismantling Of Formwork For Baldrame Beam, Lot 1 - Assembly And Dismantling Of Formwork For Rectangular Pillars And Similar Structures, Simple Right Foot, 1 Use. Af_09/2020, Lot 1 - Pillar Or Beam Frame Of Conventional Reinforced Concrete Structure Using 5.0 Mm Ca-60 Steel - Assembly. Af_06/2022, Lot 1 - Pillar Or Beam Frame Of Conventional Reinforced Concrete Structure Using Ca-50 Steel Of 16, Lot