Tenders Are Invited For Reconstruction Of The Street On Samuilova Krepost Street - O.T.81 - O.T.82 - O.T.83 - O.T.95 - O.T.97 - O.T.108 - O.T.111 - O.T.114 - O.T.127 - O.T.137 - O.T.143, Including Intersections And Street Water Supply In The Section Of The Reconstruction, Mikhnevo Village, Petrich Municipality
Tenders Are Invited For Reconstruction Of The Street On Samuilova Krepost Street - O.T.81 - O.T.82 - O.T.83 - O.T.95 - O.T.97 - O.T.108 - O.T.111 - O.T.114 - O.T.127 - O.T.137 - O.T.143, Including Intersections And Street Water Supply In The Section Of The Reconstruction, Mikhnevo Village, Petrich Municipality
Samuilova Fortress Street - O.T.81 - O.T.82 - O.T.83 - O.T.95 - O.T.97 - O.T.108 - O.T.111 - O.T.114 - O.T.127 - O.T.137 - O.T.143 Is In Poor Technical Condition, As The Asphalt Pavement Is Missing Along Its Entire Length. The Existing Crushed Stone Pavement Has Local Excavations, And The Lack Of Curbs Creates Conditions For Water Retention, Impaired Drainage Of Surface Water And Further Deterioration Of The Pavement. The Poor Condition Of The Street Makes It Difficult For Cars And Pedestrians To Move Normally, Thus Leading To An Increased Risk Of Traffic Accidents. A Complete Reconstruction Of The Road Structure, Replacement Of The Curbs And Restoration Of The Pavement Is Required. The Existing Gauge Of The Street Lane Is Approximately 5.70 M. To 9.89M, And Length 712M. There Are Existing Manholes And Street Drains In The Street Section. The Existing Water Supply Is Eternite Water Supply Ф60 And Ф80, Which Has Expired And Needs To Be Replaced. The Existing Eternite Water Pipeline Will Be Replaced With A New Pehd Ф90, With A Length Of 680.0 M. The Water Pipeline Is Physically Amortized And Worn, Which Leads To Accidents, Interruption Of Water Supply, Deterioration Of Water Quality, And Excavation Of Sections. Replacement With New Plumbing Is Imperative To Reduce Accidents And Losses. Scope Of The Public Order - Execution Of Construction And Installation Works, Including All Activities Laid Down In All Parts In The Developed Technical Project. 1. Replacement Of The Existing Eternite Plumbing With New Pe Pipes: Excavation Of Existing Pavement; Excavation Works; Delivery And Laying Of Pe Pipes; Construction Of Building Water Diversions And Fire Hydrants; Laying Of Signal And Detector Strips; Disinfection And Hydraulic Testing Of The Water Supply; Reverse Embankment. 2. Road Works: Delivery, Laying And Compaction Of 25Cm - Unsorted Crushed Stone; Delivery And Installation Of Reinforcing Mesh N8, 150/150 Mm; Laying Of Concrete Pavement C25/30 With Polypropylene Fibers - 12 Cm And Making Working Joints 2 Mm; Laying Of New Curbs With Dimensions 15/25/50; Implementation Of Rain Catchment Shafts (Street Drains). 3. Temporary And Permanent Organization Of Traffic.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.