Tenders Are Invited For Construction Of Reinforced Concrete Road Construction Project Mon Lao Route To Pu Yang, Village No. 3, Ban Thung Triam, Road Surface Size Is 4 Meters Wide, 1,742 Meters Long, 0.15 Meters Thick, Or An Area Of Not Less Than 6,968 Square Meters, Along With Installing 20 Sets Of Street Lamps, Foldable Lamps, Solar-Powered Led Lamps, Wiang Hao Subdistrict Administrative Organization. Phan District, Chiang Rai Province
Tenders Are Invited For Construction Of Reinforced Concrete Road Construction Project Mon Lao Route To Pu Yang, Village No. 3, Ban Thung Triam, Road Surface Size Is 4 Meters Wide, 1,742 Meters Long, 0.15 Meters Thick, Or An Area Of Not Less Than 6,968 Square Meters, Along With Installing 20 Sets Of Street Lamps, Foldable Lamps, Solar-Powered Led Lamps, Wiang Hao Subdistrict Administrative Organization. Phan District, Chiang Rai Province
Asia-Pacific Economic Cooperation, APEC,Association of Southeast Asian Nations, ASEAN,APAC (Asia Pacific)
15-01-2026
Work Detail
Bidding For Construction Of Reinforced Concrete Road Construction Project Mon Lao Route To Pu Yang, Village No. 3, Ban Thung Triam, Road Surface Size Is 4 Meters Wide, 1,742 Meters Long, 0.15 Meters Thick, Or An Area Of Not Less Than 6,968 Square Meters, Along With Installing 20 Sets Of Street Lamps, Foldable Lamps, Solar-Powered Led Lamps, Wiang Hao Subdistrict Administrative Organization. Phan District, Chiang Rai Province By Means Of Electronic Bidding (E-Bidding)
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.