Industrial Control Software Development Services – G08_00 Migration Of Outstations Steinfort And Leudelange. The Existing Controls Of 11 Outdoor Stations (Rain Overflow Basins, Pumping Stations And A Transfer Structure) With A Total Of Around 2,568 I/O Are To Be Modernized And Integrated Into The Higher-Level Pcs7 Control System Of Sidero. The Existing Control Hardware Is Expanded Or Replaced Where Necessary.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.