Road Bridge Construction Work – B6 Ou Neustadt Db Bridge - Temporary Bridge Including Bypass. Construction Of A Temporary Bridge Including Bypassing Main Positions, Main Masses 4,400 M Carry Out Vibratory Compaction 800 M³ Unused. Concrete Installation And Demolition 350 M³ Reinforced Concrete Installation And Demolition 80 T Reinforcing Steel Installation 300 M² Anchor Wall Production And Dismantling 900 M² Support Pile Wall Production And Dismantling 500 M Anchor Installation And Dismantling 38 Months Supply, Maintain, Dismantle Temporary Bridge 80,000 M³ Dam Material Installation And Dismantling 1,500 M³ Excavation Pit Production And Dismantling 8,500 M³ Of Coarse-Grained Soil Delivered And Expanded 26,000 M³ Topsoil Removal And Disposal 4,600 M² 3-Layer Asphalt Installed And Removed 1,400 M² Asphalt Base Layer Installed And Removed