General Procurement Notice For Acquisition Of Goods And The Contracting Of Works, Related Services, And Consulting Services For Rural Connectivity Improvement Program
General Procurement Notice For Acquisition Of Goods And The Contracting Of Works, Related Services, And Consulting Services For Rural Connectivity Improvement Program
General Procurement Notice for Acquisition of Goods and the Contracting of Works, Related Services, and Consulting Services for Rural Connectivity Improvement Program. Summary: The main goods, services, and works to be acquired are transportation infrastructure, construction, paving and maintenance of road sections and bridges, specialized technical services for studies, works supervision and assistance to contractors, institutional strengthening activities, and program administration and supervision. The works will be located in the Departments of Caazapá, Caaguazú, Canindeyú and Alto Paraná, San Pedro, Concepción and Itapúa. The Government of Paraguay has received financing in the amount of seventy-five million US dollars (USD 75,000,000) from the Inter-American Development Bank (IDB) and intends to use these funds to make payments for the acquisition of goods and the contracting of works, related services, and consulting services under the Rural Connectivity Improvement Program. The overall objective of the program is to improve the competitiveness of the agricultural sector and the economic and social development of the rural population. The specific objective is to improve the quality of the road infrastructure of the intervened local road network. To achieve the above objectives, the Project comprises a single component: Single Component: Improvement of the local road network. This component will primarily finance the improvement of approximately 123 km of local roads, engineering studies and designs, socio-environmental studies, and technical and socio-environmental supervision of the works. The works will include: structural improvement of the roads, construction of drainage systems, erosion control and slope protection measures, improved road surfaces such as double surface treatment or asphalt, bridge construction, and maintenance of the improved roads for four (4) years. A practical manual will be developed and disseminated in coordination with FONPLATA to guide contracting companies on how to incorporate a gender perspective into their management, along with a guide for the inclusion of people with disabilities in the workplace. A program to prevent gender-based violence will also be implemented at the construction sites and within the surrounding communities. Funding will also be provided for updating the Master Plan for Transportation Infrastructure and Services and for the design and implementation of a school road plan, incorporating signage, design criteria, and infrastructure to improve accessibility and safety in the areas surrounding schools within the projects influence zone. The total cost of this component is USD 69,950,000. [Disclaimer: The above text is machine translated. For accurate information kindly refer the original document.] Tender Link : https://idbdocs.iadb.org/wsdocs/getdocument.aspx?docnum=EZIDB0002344-517027895-13
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.