sysendalen Treatment Plant - Tender Competition Maurset Infrastruktur, Em . Descriptioneidfjord Municipality Is To Establish A New Treatment Plant For Sysendalen In Accordance With The New Discharge Permit From 2023. Existing Treatment Plants In The Area Do Not Meet Current Treatment Requirements (Secondary Treatment), And Must Be Closed Down. This Contract Includes The Establishment Of A New Pumping Line For The Transfer Of Waste Water From The Existing Maurset Treatment Plant To The Existing Pumping Station At Rypebrotet. The Existing Treatment Plant At Maurset Is To Be Converted Into A Pumping Station, But This Must Be Carried Out In A Later Date When The New Sysendalen Treatment Plant Has Been Built And Put Into Operation. This Contract Only Includes The Establishment Of The Transmission Line, And The Rebuilding Of The Maurset Treatment Plant Is To Be Carried Out As A Separate Contract. The New Transmission Line From The Maurset Treatment Plant Crosses Over A Tributary To Bjoreio, And Is To Be Established Over Bog With Controlled Drilling Towards The Entrance To Maurset Landhandel. At Maurset Landhandels, The Line Will Be Established By Digging Along And Past The Current Buffer Tank And Pump Station. The Transmission Line Will Be Established Further With Controlled Drilling Over A New Marsh Area, Before It Is Laid In The Last Part Of The Ditch Towards The Existing Pump Station At Rypebrotet. At This Pumping Station, The New Transmission Line Will Cross The National Highway With Drilling In Loose Masses, And Finally Be Connected To The Existing Spillway Line That Goes Towards The New Sysendalen Treatment Plant. The Scope Of The Work Can Be Summarized With The Following Points: - Excavation/Blasting Of The Cable Trench For The New Transmission Line, Length Approx. 505 M - Controlled Drilling In Bog, Length Approx. 605 M- Drilling In Loose Masses, Length Approx. 30 M - Establishment Of A Power Line Route For The Future Cabin Field, Length Approx. 54 M - Establishment Of Rigging Space/Temporary Depot - Establishment Of Soil Protection And Revegetation Of Green Areas - Option For Establishment Of An Underwater Pipeline, Length Approx. 50 M Estimated Start-Up, Construction Time And Completion Are Indicated In The Attached Indicative Progress Plan. The Developer Reserves The Right To Implement If, Contrary To Expectations, A Permit To Start The Work Is Not Obtained, Funding Is Not Available Or Other Unexpected Circumstances Arise.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.