Arab World1,Gulf Cooperation Council, GCC,Middle East,Middle East and North Africa, MENA
12-01-2026
Work Detail
Quotation are invited for Specialist Services for Siemens V94.2 Gas Turbine Major Inspection at "H"- Power Station, Al-Aweer, DEWA. SERVICES TO BE DONE AS PER ATTACHED SCOPE OF WORK.SPECIALIST SERVICES FOR SIEMENS V94.2 GAS TURBINE MAJOR INSPECTION AT #H#- POWER S TATION, AL-AWEER, DEWA # SCOPE OF WORK:# SPECIALIST SERVICES TO PERFORM SPECIFIC TASK INDEPENDENTLY IN DAY/NIGHT SHIFT UNDER DEWA ST AFF SUPERVISION FOR SIEMENS V94.2 GAS TURBINE MAJOR INSPECTION AS PER ANNEXURE -I# CONTRACTOR TO ENSURE ALL PERSONNEL ARE TRAINED FO R MAJOR OVERHAUL OF SIEMENS V94.2 GAS TURBINES AND HAVE MINIMUM OF 7 TO 10 YEARS WORK EXPERIENCE.# VENDOR SELECTION WILL BE BASED ON REVIEW OF CVS / PERSONAL INTERVIEW BY DEWA ENGINEER IN CHARGE. CONTRACTOR TO SUBMIT LATEST UPDATED CVS OF PERSONNEL TO BE ENGAGED .# CONTRACTOR MUST SUPPLY ALL SELECTED PERSONNEL CONTINUOUSLY DURING GT MAJOR INSPECTION AS PER DEWA ENGINEER IN-CHARGE REQUIREMENT. # NO LEAVE SHALL BE ALLOWED DURING OUTAGE DURATION. CONTRACTOR TO REPLACE SIMILAR EXPERIENCED SKILLED PERSONNEL ON IMMEDIATE BASIS I N CASE OF ANY EMERGENCY LEAVE.# WORKING HOURS WILL BE FORM MONDAY TO SATURDAY IN DAY SHIFT (7:30 ~18:30 HRS) AND NIGHT SHIFT (18:30~ 5:30 HRS) INCLUDING ONE HOUR LUNCH BREAK AND TEA BREAKS AS PER DEWA TIMING. HOWEVER, WORKING DAYS AND TIMING MAY BE REVISED BASED ON ACTUAL WORK PROGRESS, IF REQUIRED.# MOBILIZATION & DEMOBILIZATION DATES OF SPECIFIC CATEGORY OF PERSONNEL SHALL BE AS PER WORK REQU IREMENT AND SHALL BE MUTUALLY AGREED BETWEEN DEWA & CONTRACTOR. OVERHAUL IS EXPECTED DURING MARCH -APRIL 2026. EXACT DATE OF MOBILIZ ATION SHALL BE INFORMED WELL IN ADVANCE.# NUMBER OF MANPOWER AND NOS OF DAY REQUIREMENT FOR EACH CATEGORY BASED ON ACTUAL WORK REQUI REMENT AND AS PER DEWA INSTRUCTION ONLY.# CONTRACTOR TO ENSURE ALL PERSONNEL ARE FULLY VACCINATED AND MEDICALLY FITS FOR THE WORK.# CONTRACTOR TO ARRANGE TRANSPORTATION, FOODS, ACCOMMODATION AND REQUIRED INSURANCE SUCH AS WORKMAN COMPENSATION POLICY, ETC. FOR THEI R PERSONNEL.# ALL PERSONAL PROTECTIVE EQUIPMENT (PPE#S) LIKE HELMET, SAFETY SHOES, FULL BODY COVERALL SUIT, ETC. WILL BE PROVIDED BY THE CONTRACTOR. ALL PPE#S MUST BE IN GOOD CONDITION AND STANDARD MAKE ONLY.# CONTACTOR PERSONNEL HAS TO STRICTLY ADHERE ALL THE SAF ETY RULES PREVAILING AT DEWA SITE.# CONTRACTOR TO SUBMIT ALL THE REQUIRED DOCUMENTS AS PER DEWA SECURITY REQUIREMENT FOR PROCESSING THE GATE PASS.# SITE SUPERVISION, PERMIT FOR WORK, TOOLS, SPARES & CONSUMABLE ITEMS WILL BE MANAGED BY DEWA.# FINAL PAYMENT WILL BE BASED ON MUTUALLY SIGNED TIME SHEET ACCORDING TO ACTUAL UTILIZATION OF MANPOWER & UNIT RATES.PLS REFER THE ENCLOSED SCOPE OF WORK FO R FULL DETAILS Qty: 1 Specialist Services for Siemens V94.2 Gas Turbine Major Inspection at "H"- Power Station, Al-Aweer, DEWA. STANDARD TERMS & CONDITIONS 1) Prices should be DDP delivery duty paid at DEWA stores. 2) Quotation to be submitted only in local currency U.A.E Dirhams 3) DEWA Standard payment terms is 30 days credit from the date of acceptance of material 4) No DEWA staff or his or her relatives up to third degree should have ownership or partnership in your company, and your participation in DEWA tenders / RFQs should not constitute a Conflict or perceived Conflict of Interest. Supplier Registration: https://srm.dewa.gov.ae/irj/portal/anonymous/regis Tender Link : https://srm.dewa.gov.ae/sap/opu/odata/sap/ZSRM_RFX_REG_BID_SRV/AttachmentSet(2412600048)/$value
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.