GTR 107200538
Tenders Are Invited For Works For Complete Or Part Construction And Civil Engineering Work – Upgrade To 2X3 Lanes Of The A3 Motorway - Lot C1.A: Section Livange Viaduct – Croix De Bettembourg Metz City Of: P.K. 7+096 - 9+740 City Of Metz: P.K. 7+096 - 7+672
ICB — International Competitive Bid
Closed
Western Europe
Tender Information
GTR Reference
107200538
Tendering Authority
Subscribe to view
Tender No
8224-2026
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Works For Complete Or Part Construction And Civil Engineering Work – Upgrade To 2X3 Lanes Of The A3 Motorway - Lot C1.A: Section Livange Viaduct – Croix De Bettembourg Metz City Of: P.K. 7+096 - 9+740 City Of Metz: P.K. 7+096 - 7+672
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Western Europe
Political Region
European Union
Last Date of Bid Submission
11-03-2026
Closed
Work Detail
Works For Complete Or Part Construction And Civil Engineering Work – Upgrade To 2X3 Lanes Of The A3 Motorway - Lot C1.A: Section Livange Viaduct – Croix De Bettembourg Metz City Of: P.K. 7+096 - 9+740 City Of Metz: P.K. 7+096 - 7+672. Widening Of The A3 Motorway On Both Sides Between P.K. 7+096 And P.K. 7+672 As Well As On The East Side Between P.K. 7+096 And P.K. 9+740. The Work Consists In Particular Of The Realization Of: - Widening Of The A3 Motorway To 2X3 Lanes With An Emergency Hard Shoulder - Construction Of Temporary Abutments For The Installation Of 3 Temporary Structures - Bridging Of The Existing Structure Oa1237 (Alzette) And Reconstruction Of The Oa1238 (Crauthemergruef) - Condemnation Of The Oa1236 (Agricultural Crossing) - Construction Of Walls Retaining - Diversion Or Protection Of Existing Networks And Installation Of New Networks - Construction Of A New Sewerage Network - Construction Of Buried And Open Retention Basins - Construction Of Foundations For Cita Gantries - Demolition And Reconstruction Of Acoustic Screens - Renewal Of The Connecting Layer And The Wearing Course On The Entire A3 Motorway Within The Project Limits - Construction Of A Cycle Path On The West Side Of The Motorway Between Livange And The Cr 132 Work Execution Time: 550 Working Days Expected Start Of Work: Summer 2026
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
5f304332-735f-4197-9178-0399c4af215a.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.