GTR 107163550

Tenders Are Invited For Expansion Of Water Supply And Sanitary Sewage Infrastructure In Kobyla Góra

ICB — International Competitive Bid Closed central europe
Tender Information
GTR Reference
107163550
Tendering Authority
Subscribe to view
Tender No
ZP.271.1.2026.BZ
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Expansion Of Water Supply And Sanitary Sewage Infrastructure In Kobyla Góra
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
central europe
Political Region
European Union
Last Date of Bid Submission
22-01-2026 Closed
Work Detail
1. The Subject Of The Order Is The Expansion Of Water Supply And Sanitary Sewage Infrastructure In The Kobyla Góra Commune. The Task Includes: 1) Construction Of The Sanitary Sewage System Kobyla Góra Ul. Widokowa And Onufry On Plot No. 687/4, 7/9, 7/13, 10/11, 10/14, 10/17, 10/23, 10/27, 10/32;2) Construction Of The Sanitary Sewage System Kobyla Góra Ul. Leśna On Plot No. 15, 31/3, 20/7, 935/2, 25/5;3) Construction Of The Sanitary Sewage System Kobyla Góra Ul. Spokojna On Plots No. 81/16, 81/19, 81/24, 860/1, 855/2, 42/2, 42/1; 4) Construction Of A Water Supply Network And A Sanitary Sewage System Kobyla Góra Ul. Fr. W. Rudy On Plots No. 209/19, 210/25, 210/35, 218/9, 218/1;5) Construction Of A Water Supply Network And A Sanitary Sewage System Kobyla Góra Ul. St. Thiela And Sójka For Plots 198/1, 200, 198/12, 201/9, 201/5, 909, 205, 203/5, 206/11, 207/15, 207/27, 208/17, 208/30, 208/21;Designed Sections Of The Sanitary Sewage System Will Be Implemented In A Gravity System And In A Gravity-Pressure System. Designed Sections Of The Water Supply Network Implemented In The Pressure System. The Above Sections Of The Task Were Implemented In The Design And Build System.6) Construction Of A Raw Water Water Pipeline With Connection To Deep Wells On Plots No. 68/2 And 64/6 In Ligota Is Aimed At Securing The Amount Of Water Supplied To Residents Covered By The Construction Of Water Supply Networks. The Task Is Based On The Design Documentation. The Task Is Aimed At Improving Water And Sewage Management In The Kobyla Góra Commune.2. The Investment Will Be Co-Financed From Funds Received From The National Recovery And Resilience Plan (Kpo) For Investments In Sustainable Water And Sewage Management In Rural Areas (B3.1.1). Component B Green Energy And Reducing Energy Consumption. Specific Objective: B3. Adaptation To Climate Change And Limiting Environmental Degradation. Reform: B3.1. Support For Sustainable Water And Sewage Management In Rural Areas. Investment: B3.1.1. Investments In Sustainable Water And Sewage Management In Rural Areas.3. The Basis For Preparing The Valuation Should Be The Scope Of Works Included In: - The Functional And Utility Program, - The Design Documentation For The Construction Of A Raw Water Water Pipeline With Connection To Deep Wells On Plots No. 68/2 And 64/6 In The Town Of Ligota, - The Provisions Of The Contractual Provisions Included In The Annex To This Specification. Underestimation, Omission And Failure To Recognize The Scope Of The Subject Of The Contract Cannot Be The Basis For A Demand Price Change, Which Should Be Treated As A Lump Sum. A Detailed Description Of The Subject Of The Order Can Be Found In Section Iii Of The Swz.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
09e2c529-314a-44b9-bcbb-68524a9eb4f2.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders