Quotation are invited for E Station 02 Motor Base Frame Machining Work. EQUIPMENT: E-STATION PH-I WHRB RE-CIRCULATION PUMP # P3801.#OBJECTIVETHE SCOPE OF WORK COVERS ON-SITE MACHINING OF MOTOR BASES FOR T HE WHRBRE-CIRCULATION PUMP P-380 AT E-STATION PH-I, TO ACHIEVE THE SPECIFIEDDIMENSIONAL ACCURACY AND FLATNESS AS PER APPROVED DRAWIN GS AND TECHNICALREQUIREMENTS.2.#SCOPE OF SERVICES2.1 MACHINING WORKSMACHINING OF MOTOR BASE TOP SURFACE AS PER GIVEN SPECIFICATIONS ANDAPPROVED DIMENSIONS.MAXIMUM MATERIAL REMOVAL SHALL BE UP TO 5 MM FROM THE MOTOR BASESURFACE.MACHINING SHALL ENSURE PROPER ALIGNME NT AND SUITABILITY FOR MOTORINSTALLATION.2.2 FLATNESS MEASUREMENT AND QUALITY CONTROLFINAL MACHINED SURFACE FLATNESS SHALL BE CHECKE D USING LASER ALIGNMENTOR LASER LEVEL INSTRUMENTS.A FLATNESS INSPECTION REPORT SHALL BE PREPARED AND SUBMITTED TO DEWA FORREVIEW AND APPROVAL.2.3 QUANTITY AND EXECUTION PLANTOTAL TWO NUMBERS OF MOTOR BASES ARE TO BE MACHINED UNDER THIS SCOPE.WORK EXECUTION SHALL B E SUBJECT TO SITE AVAILABILITY, AND MACHININGACTIVITIES MAY BE CARRIED OUT IN MULTIPLE STAGES.MULTIPLE MOBILIZATIONS AND DEMOBILIZAT IONS OF MACHINING TOOLS ANDMANPOWER SHALL BE INCLUDED WITHIN THE CONTRACTOR#S SCOPE.3.#CONTRACTOR#S SCOPE OF RESPONSIBILITYTHE CONTR ACTOR SHALL BE RESPONSIBLE FOR THE FOLLOWING:MOBILIZATION, DEMOBILIZATION, AND TRANSPORTATION OF ALL MACHINING TOOLS,EQUIPMENT, CONS UMABLES, AND MANPOWER TO AND FROM E-STATION DEWA JAPS.INSTALLATION, SETUP, ALIGNMENT, AND REMOVAL OF MACHINING EQUIPMENT ATSITE.EXEC UTION OF WORKS IN ACCORDANCE WITH APPROVED DRAWINGS, SPECIFICATIONS,AND SAFETY REQUIREMENTS.COMPLIANCE WITH DEWA SAFETY RULES, SITE REGULATIONS, AND PERMIT-TO-WORKREQUIREMENTS.PROTECTION OF SURROUNDING EQUIPMENT, STRUCTURES, AND SURFACES DURINGMACHINING ACTIVITIES .HOUSEKEEPING OF THE WORK AREA AFTER COMPLETION OF ACTIVITIES.4.#DEWA SCOPE OF RESPONSIBILITYDEWA SHALL PROVIDE THE FOLLOWING:CRANE, FORKLIFT, AND RIGGING SERVICES REQUIRED FOR HANDLING OF MOTORBASES AND HEAVY EQUIPMENT.POWER SUPPLY, WATER, AND ELECTRICITY NECESSA RY FOR EXECUTION OFMACHINING WORKS AT SITE.ACCESS TO THE WORK AREA AS PER SITE AVAILABILITY AND OPERATIONALCONSTRAINTS.5.#SAFETY AND COMPLIANCEALL WORKS SHALL BE PERFORMED IN COMPLIANCE WITH DEWA SAFETY STANDARDS,RELEVANT STATUTORY REGULATIONS, AND INDUSTRY BEST P RACTICES.THE CONTRACTOR SHALL ENSURE DEPLOYMENT OF QUALIFIED AND COMPETENTPERSONNEL.NECESSARY WORK PERMITS, RISK ASSESSMENTS, AND ME THOD STATEMENTS SHALL BESUBMITTED AND APPROVED PRIOR TO COMMENCEMENT OF WORK.6.#DELIVERABLESMACHINED MOTOR BASE SURFACES MEETING SPE CIFIED TOLERANCES.LASER FLATNESS MEASUREMENT AND INSPECTION REPORT.COMPLETION CONFIRMATION FOR EACH MOTOR BASE AFTER MACHINING. Qty: 2 E Station 02 Motor base frame machining work drawing attached Contact
[email protected] STANDARD TERMS & CONDITIONS 1) Prices should be DDP delivery duty paid at DEWA stores. 2) Quotation to be submitted only in local currency U.A.E Dirhams 3) DEWA Standard payment terms is 30 days credit from the date of acceptance of material 4) No DEWA staff or his or her relatives up to third degree should have ownership or partnership in your company, and your participation in DEWA tenders / RFQs should not constitute a Conflict or perceived Conflict of Interest. Supplier Registration: https://srm.dewa.gov.ae/irj/portal/anonymous/regis Tender Link : https://srm.dewa.gov.ae/sap/opu/odata/sap/ZSRM_RFX_REG_BID_SRV/AttachmentSet(2332600020)/$value