Reducing The Energy Intensity Of Nerudova Kindergarten, České Budějovice. The Subject Of The Performance Is The Reduction Of The Energy Demand Of The Nerudova Kindergarten, Nerudova 2247/53, 370 04 České Budějovice. The Buildings Of The Kindergarten Complex At Nerudová Street 53, České Budějovice Are Brick Buildings Dating From The 1960S, Built As Part Of The Z Event. These Are Three Independent Buildings Set In The Garden Of The Complex Connected By A Communication Skeleton Of Sidewalks. The Main Walkway Between The Individual Pavilions Is Covered With An Open Steel Structure With A Metal Roof. Buildings So.01 – Pavilion I And So.03 – Pavilion Ii Are Two-Story Gable Roofed The Roof. Building So.02 – Economic Pavilion Is A Single-Storey Building Covered With A Gable Roof. All Objects Are Connected By Object So.04 – Covered Walkway. Internal Modifications Of Existing Buildings Will Be Solved. Load-Bearing Walls In Buildings Will Be Removed, Creating New Layouts. Part Of The Internal Construction Modifications Will Be: - Complete Replacement Of Electrical Installation, Water Supply, Sewerage, Heating - New Hvac Distribution Systems With The Installation Of New Units - Complete Replacement Of The Tread Layers Of The Floors - Removal Of All Plaster And Ceramic Tiles - Replacement Of Internal Doors Incl. Door Frame - Replacement Of Hole Fillings - The Ceiling Structure In The Attic Space Will Be Insulated And The Attic Space Will Be Made Accessible Through A New Entrance In The Gable Of The Individual Buildings - New Railings Will Be Installed On The Stairs And Terraces - Visual Anti-Noise Cassettes Will Be Installed On The Ceiling In The Childrens Rooms - The Ventilation Duct Will Be Covered - Suspended Ceilings Will Be Made From Sdk With Inserted Acoustic Insulation From Mineral Wool - New Canopies Will Be Installed In Front Of The Entrances To The Buildings In The Exterior, The Perimeter Walls Will Be Insulated With Mineral Wool Thick. 180 Mm, Plinth Parts With Extruded Polystyrene Thickness 140 Mm. The Top Plaster Will Be Pasty With A Progressive Self-Cleaning Effect, Resistant To Microorganisms. A New Access Ladder Will Be Installed On The Facade Of Individual Buildings. A Separate Building Object So.05 Consists Of A Wooden Outdoor Gazebo. There Will Be A Partial Construction Of The Site Sewerage System (So.07) And Complete Implementation Of The Water Supply System, Including Associated Works. Paved Areas, Landscape And Garden Improvements And Game Elements Will Be Dealt With In The Area. Greenery Will Be Comprehensively Addressed In The Scope Of The Draft Dendrological Assessment. Trees Will Be Protected During Construction According To Čsn 83 6091 Protection Of Trees, Vegetation And Vegetation During Construction Work. There Will Be A Complete Installation Of A Photovoltaic Power Plant (So.08) On The Roof Of Pavilion I. (So.01). The Implementation Of The Work Will Be Carried Out In Three Stages, Which Are Defined By A Separate Project Documentation Of The Phasing. The Contractor Must Ensure The Technical And Technological Operability Of The Entire Kindergarten Area In The Interim After The Completion Of Work On Stage 1 And Before The Start Of Work On Stage 2. Furthermore, After The Completion Of Work On Stage 2 And Before The Start Of Work On Stage 3. The Contractor Must Also Ensure The Supply Of Electricity, Heat And Hot And Cold Water To The Rest Of The Kindergarten Grounds During The Work On The Individual Stages In Non-Holiday Months. During The Implementation Of The 1St Stage, The Operation Of So.03 - Pavilion Ii, Including The Access Roads And The Associated Garden, Will Be Ensured. Marked As 2Nd And 3Rd Stage In Staging. During The Implementation Of The 2Nd And 3Rd Stages, The Operation Of So.01 And So.02 - Pavilion I And The Economic Pavilion, Including Access Roads And The Associated Garden, Will Be Ensured. The Respective Affected Buildings Will Always Be Fully Shut Down During The Reconstruction Period. All Work Will Be Carried Out According To The Schedule Drawn Up By The Contractor And Approved By The Client And The Nursery School Operator. The Contractor Is Obliged To Consult The Progress Of The Work In Detail With The Client And With The Kindergarten Operator, Or The Director Of The Kindergarten And Respect Their Requirements For Carrying Out Work. The Building Authority Imposed On The Builder The Obligation To Carry Out A Trial Operation Following The Conditions Of The Binding Opinion Of The Regional Hygiene Station Of The South Bohemian Region. The Trial Run Will Be Implemented Gradually After The Individual Stages Of The Work. The Completion Of The Trial Operation For The Entire Work, And Thus The Fulfillment Of The Conditions For The Issuance Of The Approval Decision, Will Only Occur After The Completion Of The Third Stage. The Clients Intention Is To Finance The Implementation Of The Subject Of This Contract Partly From A Subsidy Within The Operational Program Living Environment 2021 – 2027, 57Th Opžp Call - Reducing The Energy Efficiency Of Public Buildings. Following The Above, The Subject Of The Contract Must Be Implemented In Accordance With The Conditions Of The Call And The Goals And Principles Of Sustainable Development And The Principle Of Do No Significant Harm (So-Called Dnsh Conditions) In The Field Of The Environment. The Building Will Be Divided Into Objects: So.01 - Pavilion I. So.02 - Economic Pavilion So.03 - Pavilion Ii. So.04 - Covered Walkway So.05 - Outdoor Gazebo So.06 - Landscaping So.07 - Site Sewerage So.08 - Photovoltaic Power Plant Reconstruction Of The Campus Water Supply System - Part Of The Separate Project Documentation. Part Of The 1St Stage Will Be The Building: So.01 - Pavilion I. - Part Of The Stage So.02 - Economic Pavilion - Part Of The Stage So.03 - Pavilion Ii. - Not Part Of The Stage So.04 - Covered Walkway - Partly Part Of The Stage So.05 - Outdoor Gazebo - Part Of The Stage So.06 - Landscaping - Partially Part Of The Stage So.07 - Site Sewerage - Partially Part Of The Stage So.08 - Photovoltaic Power Plant - Part Of The Stage Reconstruction Of The Campus Water Supply System - Not Included Part Of The 2Nd Stage Will Be The Building: So.01 - Pavilion I. – Not Part Of The Stage So.02 - Economic Pavilion - Not Part Of The Stage So.03 - Pavilion Ii. - Part Of The Stage So.04 - Covered Walkway - Partly Part Of The Stage So.05 - Outdoor Gazebo - Not Part Of The Stage So.06 - Landscaping - Partially Part Of The Stage So.07 - Site Sewerage - Partially Part Of The Stage So.08 - Photovoltaic Power Plant - Not Part Of The Stage Reconstruction Of The Campus Water Supply System - Not Included Part Of The 3Rd Stage Will Be The Building: So.01 - Pavilion I. – Not Part Of The Stage So.02 - Economic Pavilion - Not Part Of The Stage So.03 - Pavilion Ii. - Not Part Of The Stage So.04 - Covered Walkway - Partly Part Of The Stage So.05 - Outdoor Gazebo - Not Part Of The Stage So.06 - Landscaping - Partially Part Of The Stage So.07 - Site Sewerage - Partially Part Of The Stage So.08 - Photovoltaic Power Plant - Not Part Of The Stage Reconstruction Of The Campus Water Supply System - Part Of The Stage The Subject Of Public Procurement Is Defined In The Project Documentation.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.