Tenders Are Invited For Engineering (Design, Maintenance, Author Supervision And Commissioning) Of The Object: Construction Of A 20/0.4 Kv Substation, With A Measurement Module Within The Project Construction Of A Regional System For The Separate Collection And Recycling Of Biodegradable Waste On The Territory Of Rsua-Omurtag
Tenders Are Invited For Engineering (Design, Maintenance, Author Supervision And Commissioning) Of The Object: Construction Of A 20/0.4 Kv Substation, With A Measurement Module Within The Project Construction Of A Regional System For The Separate Collection And Recycling Of Biodegradable Waste On The Territory Of Rsua-Omurtag
The Subject Of This Order Is Engineering (Design, Srm, Authors Supervision And Commissioning) Of A Site: Construction Of A Substation Type 20/0.4 Kv, With A Measurement Module Within The Project Construction Of A Regional System For Separate Collection And Recycling Of Biodegradable Waste On The Territory Of Rsua-Omurtag. Note: Detailed Information On Site Location, Technical Parameters And Requirements Are Given In The Technical Specification, Which Is An Integral Part Of This Documentation. The Main Types Of Activities Included In The Subject Of The Order: Activity No. 1. Design The Activity Consists Of The Preparation Of An Investment Project In The Technical Design Phase For The Site: Construction Of A Substation Type 20/0.4 Kv, With A Measurement Module Under The Project Construction Of A Regional System For The Separate Collection And Recycling Of Biodegradable Waste On The Territory Of Rsua-Omurtag, In Accordance With The Requirements Of Opinion No. Puprok-1106 Of 18.02.2025. Of Erp Sever Ad And Including: Part Electrical; Part Geodesy; Part Architectural; Part Constructive; Part Safety And Health Plan (Shp); Part Fire Safety (Pb); Part Construction Waste Management Plan (Cwmp); Part Accounting Documentation. Activity No. 2 Performance Of Construction And Assembly Works (Smr) Implementation Of The Planned Smr For The Object In Accordance With The Provisions Of The Approved Investment Project, Which Fully Cover The Requirements Of No. Puprok-1106 Of 18.02.2025. Of Erp Sever Ad. Activity No. 3 Exercising Author Supervision During Construction Execution Author Supervision Of The Site Is In Accordance With The Requirements Of Art. 162 Of The Zut With The Aim Of Ensuring The Successful Implementation Of The Project And The Signing Of Acts And Protocols In Accordance With The Requirements Of Ordinance No. 3 Of July 31, 2003 For Drawing Up Acts And Protocols During Construction (Promulgation Of Sg No. 72 Of August 15, 2003, Amended By Sg No. 37 Of May 4, 2004, Amended By Sg No. 29 Of April 7, 2006, Amendment No. 98 Of December 11, 2012) And Ordinance No. 2 Of July 31, 2003 On Commissioning Of Construction And Installation Works, Facilities And Construction Sites (Official Gazette No. 72 Of August 15, 2003, Amendment No. 49 Of June 14, 2005 And Amendment No. 98 Of December 2012 - Prepared By The Executive. Activity No. 4 Commissioning Of The Facility Providing Assistance To The Employer During The Commissioning Of The Site. According To Art. 137, Para. 1, Item 3, B. E And G From The Zut Object Is A Third Category Of Construction.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.