Underground Work Other Than Tunnels, Shafts And Subways – Tiefbauarbeiten Ba 1. 250 T Building Break Up Superstructure 1,990 M3 Create Excavation Pit 930 M3 Soil Single Pipe Trench 935 M3 Soil Deliver 400 M3 Rc Material Deliver 165 M Sewer Pp Dn 160 25 M Sewer Pp Dn 200 70 M Sewer Pp Dn 250 20 M Sewer Pp Dn 300 85 M Sewer Pp Dn 400 227 Pieces Storage Elements 129 Pieces Storage Elements With Inspection Channel 292 Pieces Basic Elements 1,050 M2 Geotextile Grk 4