Cleaning And Sanitation Services In Urban Or Rural Areas, And Related Services - Performance Of Activities To Ensure The Conductivity Of The Riverbeds Of The Lukovitsa River, The Elenka River And Dere Vlasa. Continued From Section: Description (Bt-24-Procedure): The Activities That Need To Be Undertaken For The Elenka River Are: Mowing With A Hand Mower, Loading And Transporting Grassy Vegetation; Felling, Uprooting, Loading And Removal Of Self-Grown Shrub Vegetation And Small Trees; Felling, Uprooting, Fallen And Tilted Trees With A Risk Of Falling Into The Water Course, Which Are Located Within The Boundaries Of The Corrected River Bed, I.E. Between The Two Walls Along The Two Banks Or In The River Bed, Loading And Unloading Unburnable Wood, Debris, Etc. And Storage And Loading Of Firewood. On The Coast, When There Is No Wall, Felling And Uprooting Of Trees With A Larger Diameter, Only Those In The Watercourse With A Risk Of Falling Or Trees That Have Fallen Into The Watercourse, Storage And Loading Of Suitable Firewood, Cutting, Loading And Removal Of Trees With A Smaller Diameter, Threshing, Etc. Sharpening The Remaining Lower Branches Of The Remaining Trees So That They Do Not Create Hydraulic Resistance; Mechanical And Manual Collection, Loading And Removal Of Accumulated Waste And Packaging Waste In The River Bed; The Activities That Need To Be Undertaken For Dere Vlas Are: Mowing With A Hand Mower, Loading And Transporting Grassy Vegetation; Felling, Uprooting, Loading And Removal Of Shrubby Vegetation And Small Trees; Felling, Uprooting, Fallen And Tilted Trees With A Risk Of Falling Into The Water Course, Which Are Located Within The Boundaries Of The Corrected River Bed, I.E. Between The Two Walls Along The Two Banks Or In The River Bed, Loading And Unloading Unburnable Wood, Debris, Etc. And Storage And Loading Of Firewood. On The Coast, When There Is No Wall, Felling And Uprooting Of Trees With A Larger Diameter, Only Those In The Watercourse With A Risk Of Falling Or Trees That Have Fallen Into The Watercourse, Storage And Loading Of Suitable Firewood, Cutting, Loading And Removal Of Trees With A Smaller Diameter, Threshing, Etc. Sharpening The Remaining Lower Branches Of The Remaining Trees So That They Do Not Create Hydraulic Resistance; Mechanical And Manual Collection, Loading And Removal Of Accumulated Waste, Packaging Waste In The River Bed. Current Acceptance Of The Work: The Inspection Will Be Carried Out On The Three Rivers Separately, And For Each Completed River, The Contractor Will Notify The Contracting Authority In Writing Of Their Completion, With The Contracting Authority Forming The Interdepartmental Commission And Carrying Out An Inspection By Inspecting The Cleaned River Bed. When There Are Remarks Described In The Finding Report By The Interdepartmental Commission, The Contractor Is Obliged To Remove Them Within The Specified Period Of The Commission And Notify The Contracting Authority. After Acceptance Without Objection Of The Cleaned River Bed, The Contractor Can Start Work On The Next River Bed. Final Acceptance Of The Object Of Completed Types Of Work Must Be Done In The Presence Of An Official From The Contracting Authority And The