4.2. The Subject Of The Order Is The Performance Of Construction Works, In Particular The Reconstruction And Expansion Of The Volunteer Fire Department Station In Firlus With A Garage Room. The Parameters Of The Building Will Change: Development Area, Usable Area And Volume, As Well As The Layout And Size Of Rooms. It Is Planned To Change The Function Of Some Of The Rooms - After The Works Are Completed, The Building Will Contain A Social Room, A Cloakroom, Toilets And 2 Garages. The Ceiling Will Be Made Of Hollow-Core Slabs With Supporting Reinforcement. Concrete Approaches, Entrances And Stairs Poured On Compacted Soil, Alternatively Made Of Concrete Cubes. Finishing These Elements With Ceramic, Anti-Slip Tiles. On All External Walls. And Internal Walls. Gr. 24 Cm Reinforced Concrete Wreaths Will Be Made. Monolithic Or System Reinforced Concrete Lintels And Beams With Backrests. The Foundation Walls Will Be Made Of Concrete Blocks With Full Joints And Cement Mortar Or As Monolithic Concrete Blocks Up To The Height Of Horizontal Insulation. Moisture-Proof And Insulated With Styrodur Boards To A Level Of 20 Cm Above The Ground. Layers Of The Foundation Wall - Plinth: - Concrete Blocks (Above Horizontal Insulation) - Damp-Proof Insulation - Styrodur Boards 2 X Fiberglass Meshes, - Styrodur Boards Attached To The Wall With Metal Expansion Pins, - Stone Tile Cladding Mounted To The Wall Up To The Height Approx. 10 Cm Above The Terrace And Entrance Platform Or Plinth Plaster (Or Clinker Tiles). All Elements Of The Structure Embedded In The Ground Will Be Insulated Against Moisture And Water. External Walls. Above The Ground Will Be Made Of Ceramic Hollow Bricks/Aerated Concrete Blocks With Cement And Lime Mortar, Thermally Insulated With Styrofoam And Fiberglass Mesh. Walls Finished With Mineral Plaster And Silicate Paint. Finishing The External Facade. Alternatively, The Light-Dry Method. Building Finishing Elements: - Roof Covering. Roofing Felt From Roofing Felt, - Roof Drainage - Gutters And Plastic Pipes; Hoods Made Of Wooden Boarding, Stained And Varnished In Colour, - Flashings Made Of Coated Sheet Metal; Roof Treatments Will Include Aprons At The Gutters, The Terrace Wall, Chimney Flashings And The Roof Hatch. Roof Vents Used As Roofing System Elements, - Soffits Under The Eaves - Formwork, Painted With Stain And Varnish, Or Alternatively Pvc Siding, Or Osb Board, On A Frame, - Suspended Ceilings And Soffits - Made Of Plasterboards. A Vapor Barrier Foil Will Be Placed On A Steel Frame Made Of Sections, Directly Above The Slab, - Floors Finished With Stoneware Tiles, Terracotta Or Floor Panels, On A Cement Base; Frost-Resistant Ceramic Tiles On The Terrace. In The Garage, There Is Screed Reinforced With Mesh - Plasters - Building Walls Finished With Cement-Lime Plaster Or A Curtain Wall Made Of, E.G. Made Of Clinker Brick, Alternatively Made Of Concrete Shapes, Pvc Or Coated Sheet Metal; Internal – Wooden, Stone, Terrazzo Or Pvc, – Sidewalks,
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.