Tenders Are Invited For Construction Of The Spa Promenade In Złockie - Stage I

Tender Detail

106895824
Zp.271.38.2025
Self-Funded
Tenders Are Invited For Construction Of The Spa Promenade In Złockie - Stage I
NCB
central europe
European Union
22-01-2026

Work Detail

3. Description Of The Subject Of The Procedure And Order: The Investment Includes The Construction Of A Spa Promenade In Złockie - Stage I, Consisting Of: - Dismantling Small Architectural Objects, Lamps And Demolition Of Existing Hardened Surfaces, - Moving And Integrating Existing Flower Sculptures That Interfere With The Investment Into The Area, - Removing Existing Trees That Interfere With The Investment, - Construction Of Small Architectural Objects, - Construction Of A Fence In The Form Of Repeatable Sections Of Variable Length (Stone Wall Fence With A Pedestal), - Construction Of Pedestrian, Bicycle And Pedestrian Routes, - Reconstruction And Security Of The Telecommunications Network, - Reconstruction And Security Of The Tauron Network, - Construction Of A Broadband Telecommunications Network (Cctv), - Construction Of An Area Lighting Network And Infrastructure Power Supply, - Construction And Reconstruction Of Water Supply Connections, - Construction Of Sanitary Sewage Connections, - Implementation Of Plant Plantings.3.1 Scope Material Scope: Material Scope Determined On The Basis Of: - Design Documentation Approved By The Decision Of The Staroste Of Nowy Sącz, Ref. No.: Bud.6740.1411.2025 Of August 22, 2025 - Notification Of October 31, 2024 Regarding The Construction Of Small Architectural Objects In A Public Place, Register No. 168/7, 263 Rev. Złockie, - Reports From September 11, 2025. Regarding The Construction Of A Fence On Plot No. 112/25, 118/2, 168/6, 168/7, 263, 284/6 Rev. Złockie Register. - Annex No. 1A To The Swz.A) The Contractor, As Part Of The Subject Of The Order, Is Obliged To Perform Construction Works In Accordance With The Construction Practice, Applicable Regulations And Standards, Based On The Prepared Documentation.B) The Contractor Will Ensure The Correct Performance Of All Works Related To The Implementation Of The Subject Of The Contract In Accordance With The Documentation And With The Currently Applicable Standards, Construction Law Together With Implementing Acts And Other Applicable Regulations, In Particular The Construction Law Together With Implementing Acts.C) Contractor Will Prepare As-Built Documentation In Accordance With Art. 3 Points 14 Of The Construction Law, Together With A Set Of Approvals, Certificates And Declarations Of Conformity For Built-In Materials And Devices. D) Completion Of The Subject Of The Contract Is Understood As The Performance Of All Works And Works Constituting The Subject Of The Contract, And In The Event Of The Requirement To Allow The Subject Of The Contract For Use, Completion Of All Activities Provided For By Law, Including Obtaining An Occupancy Permit On Behalf Of The Ordering Party Or Effective Notification Of The Competent Construction Supervision Authority About The Completion Of Construction And Handing Over, Together With A Complete Set Of As-Built Documentation, To The Ordering Party. E) The Deadline For The Completion Of The Subject Of The Contract Is The Date

Key Value

Tender Value
Refer document

Attachment

FileName File Description
Global Tender Document b30f85ac-7236-4883-b810-66ed717eacac.html
Attachments
Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail