1. The Subject Of The Order Is: Development Of Comprehensive Construction Documentation, Obtaining A Building Permit Or Notification Of Construction Or Other Construction Works, And Performance Of Construction And Assembly Works Related To: - The Construction Of A Panel Fence For Plots And - The Construction And Installation Of A Monitoring System In Tomaszów Mazowiecki On The Site Of A Post-Industrial Waste Landfill At Ul. Piaskowa 157 And In The Sewage Sludge Lagoons At Ul. Henrykowska 2/4.2. The Scope Of The Order Includes: 1) Development Of Technical Documentation For Land Development: A) Development Of A Map For Design Purposes. B) Preparation Of Design Studies In Accordance With The Scope Specified In The Tender Materials, I.E. Functional And Utility Program And Obtaining The Required Effects (Utility, Technical, Technological, Quality, Visual, Aesthetic And Functional Parameters), Resulting From This Fup Together With Annexes, Requirements, Network Operators And Media Suppliers, Public Road Managers And Other Issued Arrangements For Which The Ordering Party Wants To Achieve And Consistent With The Provisions Of Applicable Law, As Well As Other Requirements Set By The Ordering Party. C) Development Of A Technical And Executive Design. D) Conducting Activities Aimed At Obtaining All Necessary Construction Consents And Administrative Decisions. E) Construction Management. F) Conducting Activities Necessary To Obtain A Permit To Use The Facility, If Required, Along With Completing The Documentation, Performing The Tests And Checks Required For This Purpose. G) Preparing As-Built Documentation. - Design The Construction Document Should Be Prepared In Accordance With The Provisions Of Construction Law, Regulations And Standards. The Project Should Have Arrangements. The Project Should Comply With The Regulations, Guidelines Adopted And Applied By The Municipality Of Tomaszów Mazowiecki. - The Contractor Will Independently Obtain The Necessary Documents, Arrangements And Decisions Necessary To Perform The Works. - The Contractor Will Present The Design Documentation To The Ordering Party For Approval. All Documentation Will Be Provided To The Ordering Party In Printed And Electronic Form (Pdf And Editable).2) Land Development - Execution Of Works: A) Preparatory Works, B) Construction Of Area Monitoring Installations, C) Construction Of Fencing Of The Areas With Installation Of Entrance Gates And Wickets.3) Characteristic Parameters Determining The Size Of The Facility Or The Scope Of Construction Works: The Scope Of Construction Works Covers The Plots: - Ul. Piaskowa 157, Plot No. 63, Precinct 0004 - Area Of The Investment Area 8.5546 Ha. Quantitative Summary Of The Designed Development Elements: A) Fencing Of The Area - Approx. 1,720 M, B) Manual Double-Leaf Gate - 3 Pcs., C) Wicket - 3 Pcs., D) Installation Of A Monitoring System - 8 Cameras On Poles. - Ul. Henrykowska 2/4, Plot No. 6/5, District 0004 - Investment Area: 7.9055 Ha And No. 6/1
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.