1. The Subject Of The Order Is The Implementation Of An Investment Including The Construction Of A Sanitary Sewage System In The Following Towns: Brzezówka Gm. Ropczyce And Includes The Construction Of: 1) Sanitary Sewage Networks In The Town Of Brzezówka With A Diameter Of 160-200 Pcv-U, Catchment Areas A, C. Catchment B Covers The Section From The Pb7 Pumping Station On Plot No. 113 Towards The North Along The Municipal Road. The Scope Of The Task Is Included On Maps No. 2 And 3 And The Pressure Sewage System Fi 90 Pe, Section C1 - Pb8, Map No. 3.2) The Sanitary Sewage Network Is Marked On Maps No. 2 And 3. The Sanitary Sewage Network Runs Along The Municipal Road In The Towns Of Brzezówka On Both Sides. The Total Length Of The Network Is Approximately 1.4 Km. And 0.4 Km Of Pressure Sewage.3) Pb8 Sewage Pumping Station With Development: Fencing, Access. The Pb8 Sewage Pumping Station Covered By This Order Should Be Equipped With Monitoring Devices Enabling The Transmission Of Information To Persons Supervising The Pumping Stations And Hydrophores, Cooperating With The Existing Monitoring, Control And Visualization System Operated By Puk Sp. Z O. O. In Ropczyce Along With The Necessary Expansion Of The Above-Mentioned Master System. The Existing System Based On Transmission Via Satel Radio Modems In The Free 869 Mhz Band Or In The Band Operated By Puk Sp. Z O. O. In Ropczyce 400 Mhz - To Be Agreed By The Operator. Master Control Is Currently Implemented In The Horner Controller, Visualization In The Wizcon Scada System (Control Maestro). It Is Necessary To Envisage The Extension Of The Scada License By The Necessary Number Of Object Variables, The Expansion Of The Controller Application And The Scada System In A Scope Analogous To The Currently Monitored Facilities (Pumping Stations And Hydrophore Stations). Match The Scope Of Monitored Signals To The Existing Structure Of Status And Command Words Of The Superior Controller At Least: Analog Signals (Status) - 3, Analog Signals (Command) - 4, Digital Signals (Status) - 14, Digital Signals (Command) - 2.2 The Subject Of The Order Does Not Include The Connection Of Buildings To The Constructed Sanitary Sewage Network.3. In The Event Of Unidentified Field Conflicts, Inability To Perform The Task Using The Adopted Work Technology Or Other Events That Prevent The Execution Of The Subject Of The Order In Accordance With The Solutions Adopted In The Design Documentation, The Costs Of Possible Alternative Solutions Are The Responsibility Of The Contractor. The Ordering Party Understands The Execution Of The Subject Of The Order As Providing The Plots With A Sanitary Sewage System.4. Under The Contract, The Contractor Is Also Obliged, Among Others, To: To: 1/ Provide Geodetic Services, Including, Before Commencing The Execution Of Works, Geodetic Marking Out Of The Works And Reporting Them To The Employers Representative And The Supervision Inspector For Acceptance, 2/ Performing Post-Construction Geodeti
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.