1. The Scope Of The Investment Includes The Construction Of Photovoltaic Installations Connected To The Power Grid (On-Grid) For The Needs Of Public Utility Buildings In The Czernichów Commune In The Design And Build Formula. The Task Carried Out In The Design And Build Formula Involves The Design And Then Actual Implementation Of The Investment In The Scope Of Delivery And Assembly Of 7 Renewable Energy Installations (Including 1 Energy Storage) For The Needs Of 5 Public Utility Buildings In The Czernichów Commune:1) Photovoltaic Installation Connected To The Power Grid With A Capacity Of 20.24 Kw: Together With An Electricity Storage Facility With A Capacity Of 50Kwh: Czernichów Commune Office In Tresna, Tresna Ul. Żywiecka 2, 34-311,2) Photovoltaic Installation Connected To The Power Grid With A Capacity Of 8.28 Kw: Municipal Social Welfare Center In Czernichów, Czernichów, Ul. Strażacka 6, 34-311,3)Instalacja Fotowoltaiczna Podłączona Do Sieci Elektroenergetycznej O Mocy 26,68 Kw: Zespół Szkolno-Przedszkolny W Czernichowie (Instalacja Nr 1), Czernichów, Ul. Turystyczna 8, 34-311.4) Photovoltaic Installation Connected To The Power Grid With A Capacity Of 15.64 Kw: School And Kindergarten Complex In Czernichów (Installation No. 2), Czernichów, Ul. Turystyczna 8, 34-311.5) Photovoltaic Installation Connected To The Power Grid With A Capacity Of 39.56 Kw: Primary School In Międzybrodzie Żywieckie, Międzybrodzie Żywieckie, Ul. Beskidzka 27, 34-312.6) Photovoltaic Installation Connected To The Power Grid With A Capacity Of 28.52 Kw: Cultural Center Kryształowe Wzgórze In Międzybrodzie Żywieckie (Installation No. 1), Międzybrodzie Żywieckie, Ul. Beskidzka 59, 34-312.7) Photovoltaic Installation Connected To The Power Grid With A Capacity Of 11.96 Kw: Cultural Center Kryształowe Wzgórze In Międzybrodzie Żywiecki (Installation No. 2), Międzybrodzie Żywieckie, Ul. Beskidzka 59, 34-312. All Installations Equipped With A System For Managing And Monitoring The Production Of Electricity From Renewable Energy Sources. The Scope Of The Order Includes, Among Others: Preparation Of Design Documentation, Including Obtaining Conditions, Agreements, Permits, Delivery Of Materials, Execution Of Construction And Assembly Works, Connection Of Renewable Energy Installations, Adjustment Works, Commissioning Of The Installation, Development Of As-Built Documentation, Service And Warranty Inspections, And Analysis Of The Installation Efficiency. The Subject Of The Order Is Described In Detail In The Functional And Utility Program, Constituting Annex No. 5 To The Swz. If The Description Of The Subject Of The Order Uses Trademarks, Patents Or Origin, Sources Or A Specific Process That Characterizes Products Or Services Provided By A Specific Contractor - The Ordering Party Allows The Inclusion In The Offer And Then The Use Of Other Equivalent Products Or Services Provided That They Have Parameters Not Worse Than Those They Replace. If The Above The Documentation Would Ind
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.