The Subject Of The Order Is The Implementation Of An Investment Task Titled: Thermal Modernization Of The Building Of The Local Government Kindergarten In Krzepice At Ul. Ryły 28 In The Design And Build Formula, Including: 1) Preparation Of Complete Design Documentation For The Construction Project.2) The Scope Of Work Results From The Energy Audit And Includes: A) Replacement Of The Heat Source With A High-Temperature Central Heating Heat Pump. And Domestic Hot Water Glycol-Water With A Capacity Of Approx. 81 Kw With A Buffer (Thermal Energy Storage), Including: - Preparatory Works - Dismantling The Existing Boiler And Installation, Adapting The Boiler Room To Install The Pump, Including Fire Protection Conditions - Drilling Vertical Wells And Installing The Lower Source Installation Along With Filling The Space With Thermocement, Installing A Distribution Well Filled With Rotameters And Constructing Horizontal Connecting Sections, - Constructing A Cooling Well With Installation Of A Submersible Pump With A Float Switch, - Installation Of A Domestic Hot Water Installation. - Domestic Hot Water Heater, - Implementation Of A Technological System, Including Filters, Safety Valves, Compensating Vessels, Heating Water Buffer (Thermal Energy Storage), System For Regulating The Supply Temperature Of The Installation, Control And Automation System With A Power Supply And Protection Cabinet, Possibility Of Remote Operation And Monitoring Of Heat Pumps Via The Internet, - Connection Of The Electrical Installation For The Ground Heat Pump Along With Technological Devices, Lightning Protection And Instrumentation And Control Installation, - Reconstruction, E.G. Bricking Up Penetrations Through Walls And Ceilings, Restoring The Plot Area To Its Original Condition After The Installation Of The Ground Source, B) Replacing External Doors And Windows, C) Modernizing Lighting - Replacing Lighting Fixtures With Led Fixtures, D) Installing A Photovoltaic Installation With An Electricity Storage Facility; E) Carrying Out Inspections, Measurements, Commissioning And Adjustments Of The Installed Installations, Obtaining Certificates Of Technical Acceptance Of The Installed Installations From External Entities, F) Obtaining The Necessary Construction And Utility Permits - If Necessary Required, G) Construction Of Nesting Boxes For Birds And Bats. The Contractor Is Also Obliged, No Later Than The Date Of Signing The Final Acceptance Protocol, To Develop And Submit The Following Documents: Post-Implementation Energy Audit (Based On The Template Of The Managing Authority Of The European Funds For Silesia 2021-2027 Program) And A Building Energy Performance Certificate (Generated From The Central Register Of Energy Performance Of Buildings) - Confirming The Execution Of The Subject Of The Order And The Achievement Of The Assumed Objectives. Indicators. The Task Is Co-Financed Under The European Funds For Silesia 2021-2027 Program (European Regional Development Fund) For Th
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.