Quotation Are Invited For Supply, Replacement, Testing & Commissioning Of Air-Cooled Chiller

Tender Detail

106894560
2492500899
Self-Funded
Quotation Are Invited For Supply, Replacement, Testing & Commissioning Of Air-Cooled Chiller
NCB
Asia
Arab World1,Gulf Cooperation Council, GCC,Middle East,Middle East and North Africa, MENA
05-01-2026

Work Detail

Quotation are invited for Supply, Replacement, Testing & Commissioning of Air-Cooled Chiller at Jebal Ali Family Building-2. 13. HEALTH, SAFETY & ENVIRONMENTAL COMPLIANCE#ALL WORKS SHALL COMPLY WITH DEWA#S HSE REGULATIONS.#CONTRACTOR SHALL PREPARE A METHOD STATEMENT AND RISK ASSESSMENT PRIOR TOCOMMENCEMENT.#ALL PERSONNEL SHALL USE APPROPRIATE PPE DURING INSTALLATION AND TESTING.#WORK AR EA SHALL BE MAINTAINED CLEAN AND SAFE AT ALL TIMES.14. SLA CONDITION1. BASED ON CRITICALITYI. P 1 - EMERGENCY: LIFE, PROPERTY, ENVIR ONMENT AND / OR BUSINESSCONTINUITY AT RISK.A.ITEM: PRIORITY P1 SLA RESPONSE DETAILSB.PRIORITY: P1- EMERGENCYC.TIME TO RESPOND: 30 MI NUTESD.TIME TO RESOLVE: 4 HOURS#TYPICAL (P1- EMERGENCY PROBLEMS)1.SIGNIFICANT IMPACT HAS OCCURRED OR HAS THE POTENTIAL TO OCCUR TO T HECLIENT / BUSINESS OPERATION.2.HEALTH AND SAFETY ISSUES. AN INJURY HAS OCCURRED, OR AN IMMEDIATE THREATOF INJURY IS PRESENT.3.SIGNI FICANT DAMAGE TO PROPERTY HAS OCCURRED.4.ANY ENVIRONMENTAL PROBLEM THAT PRESENTS AN IMMEDIATE RISK OF SIGNIFICANTCONTAMINATION OF TH E RESIDENCE, WORKPLACE OR ENVIRONMENT.5.ANY RISK THAT WOULD ENDANGER SECURITY OF THE PROPERTY AND OCCUPIERS.II. P2 - NON-EMERGENCY; CANNOT WAIT UNTIL THE NEXT SCHEDULED VISITWITHOUT HAVING A NEGATIVE IMPACT TO THE CLIENT / BUSINESS OPERATION.A.ITEM: PRIORITY P2 SL A RESPONSE DETAILSB.PRIORITY: P2-URGENTC.TIME TO RESPOND: 30 MINUTESD.TIME TO RESOLVE: 8 HOURS#TYPICAL (P2- URGENT PROBLEMS)1.MINOR IMPACT HAS OCCURRED OR HAS POTENTIAL OF OCCURRING TO THE CLIENT /BUSINESS OPERATION.2.POTENTIAL OCCUPATIONAL HEALTH AND SAFETY ISSUE PRESENTING POSSIBLETHREAT OF INJURY.DEWA-CONFIDENTIAL3.ENVIRONMENTAL ISSUE PRESENTING POTENTIAL RISK OF MINOR CONTAMINATION OFRESID ENCE, WORKPLACE OR ENVIRONMENT.III. P3- ROUTINE: SERVICE THAT CAN WAIT UNTIL A REGULAR VISIT WITHOUTHAVING A NEGATIVE IMPACT TO THE CLIENT / BUSINESS OPERATION.A.ITEM: PRIORITY P3 SLA RESPONSE DETAILSB.PRIORITY: P3-ROUTINEC.TIME TO RESPOND: 1 DAYD.TIME TO RESOLVE: 2 DAYS#TYPICAL (P3-ROUTINE PROBLEMS)1.MINOR PRESENTATION ISSUE.2.POTENTIAL OCCUPATIONAL HEALTH AND SAFETY ISSUE.3.NO THREAT OF INJU RY IS PRESENT.15. GENERAL CONDITION & MOBILIZATION AT SITE OF THE CONTRACT1. THE CONTRACTOR SHALL OBTAIN ALL NECESSARY APPROVALS/CLE ARANCE FROMCONCERNED DEWA ENGINEER/SUPERVISOR BEFORE COMMENCING ANY MAINTENANCEACTIVITIES.2. SUPERVISOR SHALL BE RESPONSIBLE FOR THE SAFETY OF MEN/ EQUIPMENTDURING THE MAINTENANCE ACTIVITIES AND ALSO MUST ENSURE THAT WORKEXECUTED IS OF HIGHEST STANDARD.3. THE CONT RACTOR SHALL TAKE CARE OF ALL RELATED FORMALITIES LIKEMOBILIZATION OF STAFF, ENSURING TOOLS & TEST EQUIPMENT#S ARE AVAILABLEAT SITE FOR CARRYING OUT THE CORRECTIVE MAINTENANCE ACTIVITIES.4. TRANSPORTATION OF STAFF FROM & TO THE SITE SHALL BE ARRANGED BY THECONTRAC TOR.5. AFTER AWARDED THE LPO CONTRACTOR MUST APPLY FOR FULL TEAM ENTRYPERMIT FOR DURATION OF 6 MONTHS FOR VARIOUS ADMIN BUILDINGS AN D FORJEBEL ALI ACCOMMODATION THE CONTRACTOR MUST APPLY FOR 3 MONTHS WITH ALLTHE SUPPORTING DOCUMENTS (PASSPORT, VISA, EID COPY, VEHI CLE DETAILS).6. DEWA WILL NOT ACCEPT ANY CLAIM FOR EXTRAS BEYOND THE ORDER PRICEDURING AND AFTER THE EXECUTION OF WORK, UNLESS THE CLAIM WITH PROPERJUSTIFICATION IS APPROVED BY DEWA MANAGEMENT.7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DISCREPANCIES OR DAMAGEO F THE EXISTING SYSTEM DURING EXECUTION OF THE WORK.8. THE CONTRACTOR MUST EXECUTE ALL RELATED WORK REQUIRED, FOR THE SAFEEXECUTION O F MAINTENANCE ACTIVITY, EVEN THOUGH NOT MENTIONED EXPLICITLYIN THE ORDER.DEWA-CONFIDENTIAL9. COVID-19 PRECAUTION MEASURES TO BE FOLL OWED AS PER DEWA HEALTH &SAFETY DEPARTMENT RECOMMENDATION UNTIL FURTHER NOTICE.10. CONTRACTOR STAFF IS REQUIRED TO ALWAYS WEAR PROPE R PERSONALPROTECTIVE EQUIPMENT ON THE SITE.16. SAFTEY PRECAUTION & SITE CLEANLINESS1. THE AREA OF WORK SHOULD BE ALWAYS KEPT CLEAN & CLEAR DURING AND AFTERWORK. IF ANY WASTE IS GENERATED, THEN IT SHOULD BE CLEANED AND DISPOSEDOF IMMEDIATELY.2. Qty: 1 Air-Cooled Chiller Supply, Replacement, Testing & Commissioning of Air-Cooled Chiller at Jebal Ali Family Building-2 for more information contact Mohideen - Phone : 553810513 STANDARD TERMS & CONDITIONS 1) Prices should be DDP delivery duty paid at DEWA stores. 2) Quotation to be submitted only in local currency U.A.E Dirhams 3) DEWA Standard payment terms is 30 days credit from the date of acceptance of material 4) No DEWA staff or his or her relatives up to third degree should have ownership or partnership in your company, and your participation in DEWA tenders / RFQs should not constitute a Conflict or perceived Conflict of Interest. Supplier Registration: https://srm.dewa.gov.ae/irj/portal/anonymous/regis Tender Link : https://srm.dewa.gov.ae/sap/opu/odata/sap/ZSRM_RFX_REG_BID_SRV/AttachmentSet(2492500899)/$value

Key Value

Tender Value
Refer document

Attachment

FileName File Description
Global Tender Document 5b4a6c70-1855-4935-a81c-cc7ab742cb23.pdf
Attachments
Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2026 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail