Excavation Of Soil By Excavators., Excavation Of Group Iii Soil With Excavators And Throwing It Aside., Iii. Excavation Of Soil By Excavators And Loading Onto Dump Trucks., Digging The Trench By Hand And Lifting It With A Crane. Group Iii Soil., Transportation Of Soil With Dump Trucks - 5 Km. 1St Class Cargo, Working In Landfill. Group Ii And Iii Soil., Manual Filling Of The Trench, I Soil., Filling Of Pits And Trenches With Bulldozers., Filling Of Pit And Trench With Bulldozer Of Soil Iii., Pneumatic Hammering Of I And Ii Group Soil., Pneumatic Hammer Iii-Iv Soil., Making The Foundation Under Pipelines: From Sand, Laying Of Dn400, Sn8 Two-Layer Corrugated Polyethylene Pipe (Koruge) Belts., Value Of Dn 400, Pe 100, Sn8 Polyethylene Pipe., Fixing Friction Waterproofing: One Layer Thickness 2 Mm (Total Thickness 10 Mm)
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.