Quotation Are Invited For Fabrication, Supply And Installation Of Temporary Pipe Spool For Diverting The Inlet Lines To L1 Wastewater Monitoring Basin As A Preparation Work For Removal Of Sludge From The Basin
Quotation Are Invited For Fabrication, Supply And Installation Of Temporary Pipe Spool For Diverting The Inlet Lines To L1 Wastewater Monitoring Basin As A Preparation Work For Removal Of Sludge From The Basin
Arab World1,Gulf Cooperation Council, GCC,Middle East,Middle East and North Africa, MENA
31-12-2025
Work Detail
Quotation are invited for Fabrication, Supply and Installation of Temporary Pipe Spool for Diverting the Inlet Lines to L1 Wastewater Monitoring Basin as a Preparation Work for Removal of Sludge from the Basin Pipe 1032505607 1 ITEM-00001 L-STATION DESAL REQUIRED FABRICATION, SUPPLY AND INSTALLATION OFTEMPORARY PIPE SPOOLS AND FITTING FOR DIVERTING ST. CONDENSER CLEAND RAIN TANK AND BLOW DOWN TANK LINES FROM POWER SIDE TO L1 WASTEWATERMONITORING BASIN.SIZE: DN150,MATERIAL : CARBON STEEL, SCH #40LENG TH: 30 MQ#TY : 2 SETWORK SCOPE :1)#SITE SURVEY TO ASSESS THE VOLUME OF WORK2)#SUPPLY AND FABRICATION OF TEMPORARY PIP SPOOL AS PER S ITE DIMENSION3)#REMOVAL OF EXISTING PIPE SPOOL TO MONITORING BASIN4)#INSTALLATION OF TEMPORARY PIPE SPOOL5)#REMOVAL OF TEMPORARY PIP E SPOOL AFTER CLEANING OF MONITORING BASIN6)#REINSTATE OF PERMANENT PIPE SPOOL TO MONITORING BASIN7)#ALL CONSUMABLES LIKE BOLTS, NUT AND SUPPORTS TO BE PROVIDED.FOR MORE [email protected] / 043226319 2 SET 2 ITEM-00001 L-STATION DESAL REQUIRED FABRICATION, SUPPLY AND INSTALLATION OFTEMPORARY PIPE SPOOLS AND FITTING FOR DIVERTING DISCHARGE OFNEUTRALI ZATION PUMPS TO L1 WASTEWATER MONITORING BASIN.SIZE: DN300,MATERIAL : PVC OR GRPLENGTH: 30 MWORK SCOPE :1)#SITE SURVEY TO ASSESS TH E VOLUME OF WORK2)#SUPPLY AND FABRICATION OF TEMPORARY PIP SPOOL AS PER SITE DIMENSION3)#REMOVAL OF EXISTING PIPE SPOOL TO MONITORIN G BASIN4)#INSTALLATION OF TEMPORARY PIPE SPOOL5)#REMOVAL OF TEMPORARY PIPE SPOOL AFTER CLEANING OF MONITORING BASIN6)#REINSTATE OF P ERMANENT PIPE SPOOL TO MONITORING BASIN7)#ALL CONSUMABLES LIKE BOLTS, NUT AND SUPPORTS TO BE PROVIDED.FOR MORE INFORMATIONVINISH.SAN [email protected] / 043226319 1 SET pipe spool L-Station Desal required fabrication, supply and installation of temporary pipe spool for diverting the inlet lines to L1 Wastewater monitoring basin as a preparation work for removal of sludge from the basin STANDARD TERMS & CONDITIONS 1) Prices should be DDP delivery duty paid at DEWA stores. 2) Quotation to be submitted only in local currency U.A.E Dirhams 3) DEWA Standard payment terms is 30 days credit from the date of acceptance of material 4) No DEWA staff or his or her relatives up to third degree should have ownership or partnership in your company, and your participation in DEWA tenders / RFQs should not constitute a Conflict or perceived Conflict of Interest. Supplier Registration: https://srm.dewa.gov.ae/irj/portal/anonymous/regis Tender Link : https://srm.dewa.gov.ae/sap/opu/odata/sap/ZSRM_RFX_REG_BID_SRV/AttachmentSet(2412502133)/$value
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.