Quotation Are Invited For Replacement / Upgradation And Integration Of An Existing Electronic Access Control (Eac) System

Tender Detail

106784546
2332503338
Self-Funded
Quotation Are Invited For Replacement / Upgradation And Integration Of An Existing Electronic Access Control (Eac) System
NCB
Asia
Arab World1,Gulf Cooperation Council, GCC,Middle East,Middle East and North Africa, MENA
06-01-2026

Work Detail

Quotation are invited for Replacement / Upgradation and Integration of an Existing Electronic Access Control (EAC) System. BOQ (JAHPS PH-1&PH-2):REPLACEMENT/ UPGRADATION AND INTEGRATION OF AN EXISTING ELECTRONICACCESS CONTROL (EAC) SYSTEM. THE SCOPE INCLU DES THE DESIGN, SUPPLY,INSTALLATION, TESTING, AND COMMISSIONING OF ALL NECESSARY COMPONENTS,INCLUDING MODIFICATIONS, FABRICATION, AN D CONFIGURATION TO INTEGRATEWITH THE EXISTING ACCESS CONTROL UNITS, CONTROL UNITS AND ASSOCIATEDREQUIRED COMPONENTSSCOPE OF WORK(PH1 -PH2) :DESIGN & ENGINEERING:DESIGN THE NEW SYSTEM ARCHITECTURE BASED ON SITE-SPECIFIC REQUIREMENTS,ENSURING COMPATIBILITY WITH THE E XISTING SYSTEM. THE DESIGN SHOULDPRIORITIZE RELIABILITY, REDUNDANCY, OPTIMIZED PERFORMANCE,AUTHENTICATION, AUTHORIZATION, EVENT LOGG ING, SYSLOG INTEGRATION, ANDCENTRALIZED MANAGEMENT AND CONTROL. DEVELOP DETAILED TECHNICALSPECIFICATIONS AND SYSTEM DRAWINGS TO SUPP ORT THESE REQUIREMENTDESIGN THE NEW SYSTEM ARCHITECTURE BASED ON SITE-SPECIFIC REQUIREMENTSAND ENSURE COMPATIBILITY WITH THE EXISTIN G SYSTEM. DESIGN SHOULDCONSIDERED RELIABLE , REDUNDANCY , OPTIMIZED SYSTEM , AUTHENTICATION ,AUTHORISATION , EVENT LOG , SYSLOG , CE NTRALIZED MANAGEMENT AND CONTROL, DEVELOP DETAILED TECHNICAL SPECIFICATIONS AND SYSTEM DRAWINGS.SUPPLY OF EQUIPMENT:SUPPLY ALL NECE SSARY HARDWARE COMPONENTS, INCLUDING # SWING HANDLE WITHEMERGENCY OPENING, LOCKING UNIT , CONTACTLESS CHIPCARD , KEYPAD ,TRANSPONDE R READER UNITS & ASSOCIATED POWER ADAPTER , CABLE , FRAME ,BRACKET , PDU & ACCESSORIESANY LICENSES IS REQUIRED FOR THE EXISTING SYST EM INTEGRATION &CONFIGURATION SHALL BE CONSIDEREDINSTALLATION & INTEGRATION:INSTALL THE NEW ACCESS CONTROL DEVICES INCLUDED MODIFICA TION,FABRICATION ARRANGEMENT AND INTEGRATE THEM WITH THE EXISTING SYSTEM.ENSURE THAT THE SYSTEM IS FULLY COMPATIBLE, FUNCTIONAL & SE CURESOFTWARE CONFIGURATION & INTEGRATION:CONFIGURE THE EXISTING CENTRALIZED MANAGEMENT SOFTWARE AND INTEGRATE ITWITH NEW HARDWARE CO MPONENTS. ENSURE THE SOFTWARE IS UPDATED TO MEETOPERATIONAL REQUIREMENTS. ANY REQUITED LICENCES SHALL BE CONSIDEREDTESTING & COMMISS IONING:PERFORM FUNCTIONAL AND OPERATION TESTING TO ENSURE THE SYSTEM OPERATESCORRECTLY , ENSURE THE AUTHENTICATION , AUTHORIZATION , EVENT LOG,EMERGENCY OPENING , CENTRALIZED SYSTEM CONTROL AND MONITORING .TRAINING & HANDOVER:PROVIDE END-USER TRAINING ON SYSTEM OP ERATION AND MANAGEMENT. DELIVERALL SYSTEM DOCUMENTATION, INCLUDING USER MANUALS, TECHNICAL GUIDES, ANDCONFIGURATION DETAILS.WARRANTE E & SUPPORTPOST-DELIVERY WARRANTY AND SUPPORT SHALL BE INCLUDED AS PART OF THEUPGRADATION PROJECT SCOPENOTE:THE UPGRADATION PROJECT SHOULD ENSURE THAT THE EXISTING SYSTEM REMAINSFULLY OPERATIONAL THROUGHOUT THE PROCESS. ANY EXISTING DEFECTS,OPERATIONAL ISSUES, REQ UIREMENTS IDENTIFIED DURING THE PROJECT SHOULD BEINCLUDED IN THE PROJECT SCOPEEXISTING PANEL INFORMATIONEXISTING PANEL INFORMATIONJA HPS PHASE-1 PSS.NO DESCRIPTION ##### MAKE# MODEL## QTY#1# PLC PANEL # ##### RITTAL#TS # 8208.500 /#4#2# SURGE VASSAL PANEL # ## RITTAL #####1#3# SERVER PANEL /WORKSTATION PANEL DELL#* 2#JAHPS PHASE-2 PSS.NO DESCRIPTION ######MAKE#MODEL## QTY# 1# PLC PANEL # RITTAL#TS # 8208.500 /#3#2# SERVER PANEL /WORKSTATION PANEL #DELL##***********#1#NOTE: A SITE VISIT CAN BE ARRAN GED FOR MORE INFORMATION IF REQUIREDFOR FURTHER DETAILS PLEASE CONTACT:NAME : HAKKIM SULAIMANEMAIL ID : [email protected] CT NUMBER: 04-3229421 , 0522139081NAME: MARYAM NAQIEMAIL ID: [email protected] NUMBER: 043220859 Qty: 1 STANDARD TERMS & CONDITIONS 1) Prices should be DDP delivery duty paid at DEWA stores. 2) Quotation to be submitted only in local currency U.A.E Dirhams 3) DEWA Standard payment terms is 30 days credit from the date of acceptance of material 4) No DEWA staff or his or her relatives up to third degree should have ownership or partnership in your company, and your participation in DEWA tenders / RFQs should not constitute a Conflict or perceived Conflict of Interest. Supplier Registration: https://srm.dewa.gov.ae/irj/portal/anonymous/regis Tender Link : https://srm.dewa.gov.ae/sap/opu/odata/sap/ZSRM_RFX_REG_BID_SRV/AttachmentSet(2332503338)/$value

Key Value

Tender Value
Refer document

Attachment

FileName File Description
Global Tender Document d64b06a2-76ec-4a73-a5b9-f401c02ec683.pdf
Attachments
Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail