Construction Work For Water And Sewage Pipelines – Pv Zrt. Cover-Up Framework Contract 2025-2026. In The Framework Of A Framework Contract, The Implementation Of The Planned Reconstruction Works Of The Sewage Network And Drinking Water Network Facilities Managed By Pannon-Víz Zrt., To Be Carried Out At The Expense Of The Renovation Fund (Fa). Pannon-Víz Zrt. Provides Water Utility Services In 121 Settlements In Its Operating Area. The Sewage Network Is Not 100% Complete. Out Of 121 Settlements, 97 Settlements Have Sewage Networks. The Waste Water Drainage Systems Of The Settlements Are Divided Into 17 Water Utility Systems. The Total Length Of The Sewage Network In The Water Utility Systems Is 2,562.4 Km. Of This, 2,347.1 Km Have A Separated System, 215.3 Km Have A Combined System, And 25.1 Km Have A Vacuum System. The Separated System Consists Of 1,104.3 Km Of Gravity And 624.9 Km Of Pressure Lines. The Length Of The Connections: 592.8 Km. Planned Amount Of Reconstruction Works: - Sewer Renovation/Reconstruction Approx. 1,400 Fm In Length - Renovation/Reconstruction Of Drinking Water Pipe Approx. 11,200 Fm In Length - Drinking Water Network Cleaning Approx. 11,200 Fm In Length In The Product Description, Instead Of A Specific Specific Product, The Contracting Authority Accepts Or Equivalent Items. The Winning Tenderer Is Obliged To Complete The Framework Contract Through Individual Orders Until The Net Amount Of Huf 990,000,000 Is Exhausted, But No Later Than November 30, 2026. The Minimum Amount Of Individual Orders Is The Offer Given By The Bidder For The 4Th Evaluation Criterion, Which Is Min. It Can Be From 2,000,000 Huf To A Maximum Of 20,000,000 Huf. The Applicant Undertakes To Order Up To 70% Of The Total Amount.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.