Architectural And Related Services – Kruft_Umbau Halle To Aemp. Description Of The Planning Task And The Construction Project; The Planned Measure Includes The Conversion Of A Warehouse Into An Aemp (Processing Unit For Medical Devices) At Bahnhofstrasse 33 In 56642 Kruft. The Basic Functions Of The Aemp Can Be Found In The Document Description Of The Planning Task. The Measure Is Publicly Funded. A More Detailed Inventory Analysis And A Basic Determination Are Currently Being Carried Out. Costs: Total Costs According To Rough Cost Estimate From October 23Rd, 2025: 1. Property 2. Develop, Kgr. 200 Approx. Eur 564,000.00 Net 3. Building Construction Kgr. 300 Approx. Net Eur 1,748,000.00 4. Technical Systems Kgr. 400 Approx. Net Eur 1,983,200.00 Use-Specific Facilities Kgr. 474 Approx. Net Eur 2,352,900.00 5. Outdoor Facilities Kgr. 500 Approx. Net Eur 50,400.00 6. Equipment Kgr. 600 Approx. Net Eur 168,000.00 Planning And Construction Times; Rough Schedule: Vgv Procedure - 5 Months Submit Lph 3 To The Funding Agency Approx. November/December 2026 Start Of Construction After Approval Notice And Building Permit Approx. The Approved Planning And Upper Cost Limit Of The Approved Costs Must Be Adhered To And May Only Be Carried Out With Detailed Justification, Approval From The Developer And Approval From The Funding Authorities. Regular Participation In Planning And Construction Meetings And Logging Of Your Own Performance And Monitoring Areas Are Included In The Planners Performance. General Note: The Corresponding Inquiry About The Presentation And The Remuneration Takes Place After The Completion Of The Participation Competition With The Invitation Of Suitable Applicants To The Negotiation Process. (See Publication)
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.