Engineering Design Services – Kishegyesi Út Infrastructural Development Planning. In The Context Of The Infrastructure Development Of Debrecen, Kishegyesi Road, The Complex Planning Of Road, Railway, Rainwater Drainage, Waste Water And Drinking Water Networks, Energy Supply And Telecommunications Infrastructure Developments Will Be Realized. Definition Of The Planning Task: The Planning Of The Development Of Debrecen, Kishegyesi Road To 2X2 Lanes From The Newly Constructed Junction Of Köteles Street - Kishegyesi Road To The Junction Of The M35 Motorway. Is Taking Place, During Which, Among Other Things, The Road Crossing Between Kishegyesi Út And Railway Line 108 Needs To Be Redesigned Into A Separate Level, And Due To The Accessibility Of The New Entrance To The Industrial Park On Határ Út, A New 2X2-Lane Roundabout On Kishegyesi Út And Its 2X1-Lane Construction Must Also Be Planned. Requests To Plan Both The 2X1 And 2X2 Lane Designs So That They Involve The Least Amount Of Demolition And Reconstruction Work.) On The Section Of Kishegyesi Út Affected By The Design, On The Section Without Bicycle Facilities (On The South Side Of Kishegyesi Út Between The Premises Of Axiál Kft. And Pipelife Hungária Kft.), It Is Also Necessary To Plan The Construction Of A New Pedestrian And Bicycle Path. The Designer Must Ensure That The Public Lighting Infrastructure Is Adequate In The Section Affected By The Development, For Which He Must Carry Out The Necessary Measurements. Also. Based On The Dimensioning, The Connecting Receiver Must Also Be Reviewed, Which Redesign Is Also The Responsibility Of The Designer, If It Is Not Appropriate. In The Case Of The Existing Combined Precipitation And Wastewater Drainage System In The Planning Area, The Planning Of The Separation Of The Combined System Must Be Carried Out Based On This Design Task. In The Case Of Intersections And Replacements, The Designer Is Responsible For Preparing The Relevant Plans And Obtaining The Necessary Permits. All The Sectoral Plans Necessary For The Implementation Of The Development Must Be Prepared. Main Planning Quantities: - Planning Of A 2,025 Km Long Lane Extension On The Existing Section From 2X1 Lane To 2X2 Lanes, With The Creation Of A New Roundabout, - Planning Of A Separate Level Road And Railway Crossing - Planning Of The Construction Of A New 1,750 M2 Pedestrian-Bicycle Path. Permits, Contributions, Legally Binding Water Rights Establishment Permits, Construction Permits - Licensing Plan Documentation, As Well As The Preparation Of Complete Construction Plan Documentation.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.