Airfield Pavement Construction Work – Establishment Of A New De-Icing Area And Standing Area. By Developing The Areas Around Terminal 2, The Tenderer Intends To Establish A New Central De-Icing And De-Icing Site, Together With The Related Social Building, Open Covered Area, And The Related Utilities And System Components Required For Energy Supply. The Purpose Of The Investment Is To Create An Area With A Surface Of ~53,080 M2 (Without Option) With A Concrete Surface, Which Will Provide A New, Centralized De-Icing And De-Icing Place And Aircraft Stands Enabling Remote Servicing Connected To The Existing Taxiways, Service Roads And Utilities In Accordance With The Relevant Easa And Other Regulations, As Well As The Airport Requirements. The Covering Design And Construction Work Is Suitable For Accommodating 4 Code C Or 2 Code E Aircraft At The Same Time. The Investment Also Includes: - The De-Icing And De-Icing Area, As Well As The Implementation Of The Transformer Station And Cabling Works Necessary For The Energy Supply Of The Remote Station, As Well As The High And Low Current Installation Works, - The Construction And Welding Of 12,700 Fm Of High-Capacity (At Least 96 Fibers) Optical Cable Within The Low-Current Work Area, Outside In 12 ∅110 Protective Tubes Placed, And Construction Of A 3,600 Fm Outdoor Cat7 S/Ftp Data Network (Structured Cabling System), - Construction Of Drainage (Toc), - Construction Of It And Security Systems (Without End Devices), - Construction Of A Social Building With All Professional Work, - Construction Of A Covered Open Space For The Storage Of Tools And De-Icing Fluid, - Development Of The Necessary Service Road Network And Construction Of Parking Areas, - Construction Of Agl And Barrier Lights, As Well As Street Lighting, - Hot Water Construction Of Systems Necessary For Supply, - Preparation Of All Connected Utility Development, Necessary Utility Replacement And Connection, - Implementation Of Preparation And Survey Tasks Related To The Above, Preparation Of Licensing Plans And Construction Documentation, Carrying Out The Necessary Licensing Procedures And Obtaining Permits. A More Detailed Functional Description Of The Task To Be Performed And Itemized Tasks Are Included In The Public Procurement Documents. 321/2015. In View Of The Provisions Of § 46, Paragraph (3) Of Government Decree (Hereinafter: 321/2015 Cr.), The Contracting Authority Draws Attention To The Fact That If A Clear And Comprehensible Definition Of The Subject Of The Public Procurement Made It Necessary To Refer To A Thing Of A Specific Make, Origin, Type, Process, Activity, Person, Patent Or Trademark, The Designation Was Made Only In Order To Clearly Define The Nature Of The Object, And In Addition To The Designation, The Or Equivalent Is Understood In All Cases. Proof Of Equivalence Is The Responsibility Of The Winning Bidder, As Specified In The Public Procurement Documents. Optional Item: - Tasks And Implementation Related To The Notification According To § 22 Of Cr. 85/2024 Of The Construction Of The H Twy Connecting Taxiway