Refuse And Waste Related Services – 3Rd Incineration Line 2K5 Sub. No. 2025-66, Wet Slag Disposal And Transport. The “2K5” Project Is The Expansion Of The Zurich-Hagenholz Waste Thermal Power Plant To Include A Third Incineration Line. The Project Consists Of The Main And Secondary Procedural Lots. For Details, See Part B “Project Description”. The Dry Slag Discharge Of The Existing Two Lines 2K1 And 2K3 Will Be Converted As Part Of The Project. During The Assembly Period, The Slag From The Two Lines Is Discharged Wet For Around Eight Months (2K1) And Three Months (2K3). The Subject Of This Tender Is The Loading, Transport, Unloading And Subsequent Landfilling Of The Wet Discharged Slag (90 Tons Per Line Per Day, Total Approx. 31,000 Tons) At An Approved Type D Landfill In Switzerland. This Tender Replaces The Canceled Submission “2025-36 Wet Slag Disposal And Transport”, Which Was Published On Simap On August 22, 2025.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.