Underground Work Other Than Tunnels, Shafts And Subways – Civil Engineering Work Preparing And Developing. Clearing And Developing The Construction Site For The Construction Of A Storage Building Within The Mainfrankenkaserne Volkach. Demolish 1010 M2 Of Paving; 4 Pieces. Demolish Existing Shaft Dn 1000; Dismantle 105 M Of Stoneware Dn250 Pipe; Remove 550 M3 Of Topsoil; Apply 50 M3 Of Topsoil; 2090 M2 Soil Consolidation, D=40Cm; 7 Pcs. Shaft Dn1000; 80 M Sewer Made Of Pp Pipes Dn250; 25 M Sewer Made Of Pp Pipes Dn160; 5 Pcs. Cable Pull Shafts; 400 T Utilization Of Soil Material.